ICS 29.240.20
K 20
Record No. J938—2009
Electric Power Industry Standard of the People's Republic of China
P DL / T 5440 — 2009
Technical Code for Designing of
Overhead Transmission Line in
Medium & Heavy Icing Area
Issue Date: July 22, 2009 implementation Date: December 1, 2009
Issued by the National Energy Administration of the People's Republic of China

DT/T 5440-2009,英文版,设计技术,重覆冰架空输电线路,DL/T 5440-2009 英文版 重覆冰架空输电线路设计技术规程

1 Scope
This code specifies the technical requirements for the routing, selection and configuration of conductors and shield wires, type and load of towers and crossing, taking into account the characteristics of heavy icing lines.
This code is applicable to the design of 110kV-750kV heavy icing transmission lines. It can also be used as a reference standard for the DC/AC heavy icing transmission lines at other voltage levels.

2 Normative References
The following normative documents contain provisions which, through reference in this text, constitute provisions of this code. For dated references, subsequent amendments (excluding the contents of errata) to, or revision of, any of these publications do not apply. However, parties to agreements based on this code are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, the latest edition of the normative document referred to applies.
GB 50545 Code for Design of 110kV-750kV Overhead Transmission Line
DL/T 5158—2002 Technical Code of Meteorological Surveying for Electrical Power Projects

3 General
3.0.1 Heavy icing lines include the transmission lines erected in medium and heavy icing areas.
3.0.2 In addition to this code, the design of heavy icing lines shall observe the requirements as specified in Code for Design of 110kV-750kV Overhead Transmission Line.
3.0.3 When designing heavy icing lines, the measures for avoiding icing or anti-icing shall be given priority. In areas where conditions permit, the measures for melting and preventing icing may be used if justified through technical and economic comparison. For the lines designed with ice melting and prevention measures, design ice thickness shall be selected appropriately to ensure that they have a certain anti-icing capability.
3.0.4 In parallel with the design of heavy icing lines, ice observation stations (points) shall be established and on-line icing monitoring shall be conducted for transmission lines if conditions permit so as to collect the data at ice observation stations and summarize the design and operation experiences.
3.0.5 For the purpose of this code, transmission lines are divided into three categories in terms of voltage levels.
Category 1: lines operating at 750kV, 500kV, and critical lines operating at 330kV;
Category 2: lines operating at 330kV, and critical lines operating at 220kV;
Category 3: lines operating at 220kV and 110kV.

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:芳华
我的头像

报歉!评论已关闭.

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)