钢筋工程精品实施手册ppt版
附件大小:14.19MB附件格式:2个直链文件,格式为pdf pptx
所属分类:施组方案
分享会员:芳华
分享时间:2022-08-09
最后更新:
资源简介/截图:
说 明
1.编制目的
为进一步提高集团工程施工质量水平,明确施工工序要求,促进对重要、重点工序的掌握,推进工程质量标准化管理,特编制本手册。
2.编制依据
(1) 《钢筋混凝土用钢·第 1 部分:热轧光圆钢筋》(GB1499.1);
(2) 《钢筋混凝土用钢·第 2 部分:热轧带肋钢筋》(GB1499.1);
(3) 《混凝土结构工程施工质量验收规范》(GB50204);
(4) 《混凝土结构工程施工规范》(GB50666);
(5) 《钢筋机械连接技术规程》(JGJ107);
(6) 《钢筋机械连接用套筒》(JG/T163);
(7) 《建筑工程冬期施工规程》(JGJ104);
(8) 《混凝土结构施工图·平面整体表示方法制图规则和构造详图(现浇混
凝土框架、剪力墙、梁、板)》(16G101-1);
(9) 《混凝土结构施工图·平面整体表示方法制图规则和构造详图(现浇混
凝土板式楼梯)》(16G101-2)
(10) 《混凝土结构施工图·平面整体表示方法制图规则和构造详图(独
立基础、条形基础、筏形基础、桩基础)》(16G101-3)
(11) 《 建 筑 物 抗 震 构 造 详 图 ( 多 层 和 高 层 钢 筋 混 凝 土 房 屋 )》(11G329-1);
(12) 《房屋建筑工程和市政基础设施工程实行见证取样和送检的规定》(建建[2000]211 号);
(13) 《北京市建设工程见证取样和送检管理规定(试行)》(京建质〔2009〕289 号)。
3.适用范围
本手册适用于中国建筑一局(集团)有限公司所属单位的所有工程项目。
4.主要内容
主要内容包括:钢筋原材管理、钢筋加工、钢筋连接、钢筋安装、冬期施工和隐蔽验收,共六个部分。
5.其他
(1) 本标准集的要求和节点做法,仅为钢筋工程施工的基本规定和做法,其他施工要求须根据设计图纸、有关标准图集、规范、规程和股份公司、集团文件规定等执行。
(2) 本标准集必须与工程所在地的政府监管部门的规定相结合使用。
(3) 本标准集中有关节点详图标准尺寸单位除特别注明外,均为 mm。
(4) 集团科技质量部负责本手册的解释工作。
目 录
钢筋工程管理流程图································································1
1 原材管理·····································································2
1.1 进场验收·····································································2
1.2 取样复试·····································································4
1.3 现场堆放····································································8
2 钢筋加工····································································12
2.1 钢筋调直····································································12
2.2 钢筋切断····································································12
2.3 受力钢筋弯折······························································13
2.4 箍筋弯折····································································15
3 钢筋连接····································································19
3.1 钢筋连接基本要求························································19
3.2 绑扎搭接····································································19
3.3 机械连接(直螺纹)·····················································22
3.4 焊接(闪光对焊、电渣压力焊)················································30
4 钢筋安装····································································34
4.1 钢筋安装基本要求························································34
4.2 钢筋安装质量保证措施··················································38
4.2.1 墙体竖向梯子筋···························································38
4.2.2 墙体水平梯子筋···························································39
4.2.3 墙体暗柱定位箍···························································41
4.2.4 柱筋定位箍·································································42
4.2.5 马凳··········································································42
4.2.6 梳子板·······································································44
4.2.7 双“F”卡具···································································45
4.2.8 预制墙体顶模棍···························································46
4.2.9 预制砂浆垫块······························································48
4.2.10 柱模定位筋(1)··························································49
4.2.11 柱模定位筋(2)··························································51
5 冬期施工······························································53
6 隐蔽验收····································································55