8.2钢管柱制作 (74) 8.3U形钢梁制作 8.4钢构件安装与连接 (76) 8.5混凝土施工 (78) 9验收 (81) 9.1一般规定 (81) 9.2U形钢梁进场质量验收 (82) 9.3外包钢混凝土梁混凝土浇筑质量验收 (83) 9.4外包钢混凝土梁连接质量验收 (84) 附录A轴力对L形钢管混凝土异形柱截面受弯承载力 的影响系数 (88) 附录B系数α、α2 (90) 附录C轴力对T形钢管混凝土异形柱截面受弯承载力 的影响系数 (95) 用词说明. (98) 引用标准名录 (99) 附:条文说明 (101)
Contents 1Generalprovisions 2Terms and symbols 2) 2.1 Terms (2) 2.2 Symbols (3) 3Materials (5) 3.1 Steel products (5) 3.2 Concrete (6) 3.3 Connection materials (6) 4Structural layout and analysis (8) 4. 1 Structural type and layout (8) 4. 2Structural analysis (11) 5Design of members (14) 5. 1 General requirements (14) 5.2 Rectangular concrete-filled steel tubular column (16) 5.3 Concrete-filled steel tubular special-shaped column 5.4 Steel-wrapped concrete beam (30) 6Design of joints 6.1 Joint of rectangular concrete-filled steel tubular and beam (48) 6. 2 Joint of concrete-filled steel tubular special-shaped column and beam ..... (61) 6.3Brace joint ... 6. 4 Column connection and footing joints 6.5 Floor joints (66) 7Fireproofing and corrosion prevention design .. (70) 8Manufacturing and construction (72) 8
8.1 General requirements (72) 8.2 Manufacturing of steel tubular column (74) 8. 3Manufacturing of U-shaped steel beam (75) 8.4 Installation and connection of steel member (76) 8.5 Concrete construction (78) 9Acceptance (81) 9. 1 Generalrequirements (81) 9.2 Site quality acceptance of U-shaped steel beam .. (82) 9.3 Concrete pouring quality acceptance of steel-wrapped concrete beam (83) 9.4 Connection quality acceptance of steel-wrapped concrete beam (84) Appendix A Influence coefficients of axial force on flexural capacity of L-shaped concrete filled steel tubular column (88) Appendix BCoefficient α、a (90) Appendix CInfluence coefficients of axial force on flexural capacity of T-shaped concrete filled steel tubular column (95) Explanation of wording (98) List of quoted standards (99) Addition:Explanation ofprovisions (101)
1总则 1.0.1为规范和促进外包钢混凝土梁-钢管混凝土柱组合结构的 推广应用,做到技术先进、安全适用、经济合理、质量可靠,制 定本规程。
1.0.2本规...