用词说明 (46) 引用标准名录 (47) 附:条文说明 (49)
Contents 1General provisions (1) 2Terms and symbols .. (2) 2.1 Terms (2) 2.2 Symbols (2) 3Design (5) 3.1 General requirements (5) 3.2 Calculation (6) 3.3 Structures (14) Construction........ (17) 4. 1 General requirements (17) 4.2 Construction preparation..... (18) 4.3 Drilling (20) 4. 4 Hole cleaning (24) 4.5 Reinforced cage (25) 4.6 Concrete (27) 5 Check and accept .... (31) 5.1 General requirements (31) 5.2 Quality checkout for pile hole (32) 5.3 Quality checkout for reinforcement cage (34) 5.4 Quality checkout for concrete (36) Appendix A Typical structure drawing of visible and controllable screw-drilled and hydraulically under-reamed cast-in-place pile of railway engineering (40)
Appendix BConstruction record form ofvisible and controllable screw-drilled and hydraulically under-reamed cast-in-place pile of railway engineering (41) Appendix CChecking method of umbrella-shaped hole-diameter instrument for visible and controllable screw-drilled and hydraulically under-reamed cast-in-place pile of railway engineering (44) Explanation ofwording (46) List of quoted standards (47) Addition:Explanation of provisions (49)
1总则 1.0.1为规范铁路工程全液压可视可控旋挖扩底灌注桩技术应 用,做到安全可靠、技术先进、经济适用,制定本规程。
1.0.2本规程适用于新建和改建铁路桥涵、路基、站场及站房等 铁路工程全液压可视可控旋挖扩底灌注桩的设计、施工和验收。
1.0.3铁路工程全液压可视可控旋挖扩底灌注桩设计和施工应 根据周边环境条件、工程地质和水文地质条件、工程特性、施工条 件和工程造价等因素确定。
1.0.4铁路工程全液压可视可控旋挖扩底灌注桩设计和施工应 保证其具有足够的强度、刚度、稳定性、耐久性,并满足设计使用年 限要求。
1.0.5铁路工程全液压可视可控旋挖扩底灌注桩的设计、施工和 验收除应符合本规程规定外,尚应符合国家现行有关标准和现行 中国工程建设标准化协会有关标准的规定。
2术语和符号 2.1术语 2.1.1全液压可视可控旋挖扩底灌注桩 visible and control- lable screw-drilled and hydraulically under-reamedcast-in- place pile 以全液压扩底铲斗配备可视化施工映像管理装置,实现全程 作业电脑管理调控,通过成孔并将桩身及底部有效扩大形成的扩 底灌注桩。
简称AM扩底桩。
2.1.2常径段 constant-diameter pile shaft 扩底桩桩顶到扩大段顶部等直径段桩身。
2.1.3扩底率 bottom expansion ratio 扩底桩设计扩底截面面积与常径段截面面积的比值。
2.2符 号 2.2.1 作用和作用效应: M- 桩下端锚固点处的弯矩; 基底压应力; x(0) 基础地面处的附加压应力。
2.2.2 抗力和材料性能: F. 岩石地基容许承载力; f 各土层的极限摩阻力; [P]- 单桩轴向受压容许承载力; [P']- 摩擦桩轴向受拉的容许承载力; R 岩石饱和单轴抗压强度; S 基础的总...