鸿通地产-工程实测实量操作指引.docx
附件大小:0.28MB附件格式:1个直链文件,格式为docx
所属分类:工程管理
分享会员:匿名用户
分享时间:2019-10-24
最后更新:
资源简介/截图:
实测实量操作指引(修订)
- 总则
- 目的·····························································3
- 适用范围··························································3
- 取样原则··························································3
- 土建篇
- 混凝土结构工程····················································3
- 基本原则······························································3
- 截面尺寸偏差(砼结构)·················································3
- 垂直度(砼结构)·······················································4
- 表面平整度(砼结构)···················································5
- 楼板厚度偏差(砼结构)·················································6
- 层高偏差(砼结构)·····················································7
- 砌筑工程
- 基本原则······························································7
- 垂直度(砌体阶段)·····················································7
- 表面平整度(砌体阶段)·················································8
- 外门窗洞口尺寸偏差(砌体阶段)·········································9
- 砌筑节点①(砌体阶段)·················································10
- 砌筑节点②(砌体阶段)·················································10
- 砌筑节点③(砌体阶段)·················································11
- 抹灰工程
- 基本原则······························································11
- 墙面垂直度(装饰阶段)·················································11
- 表面平整度(装饰阶段)·················································12
- 阴阳角方正(装饰阶段)·················································13
- 房间开间/进深偏差(装饰阶段)··········································14
- 户内门洞尺寸偏差(装饰阶段)···········································14
- 门、窗洞口墙体厚度极差(装饰阶段)·····································15
- 裂缝、空鼓(装饰阶段)·················································16
- 室内净高偏差(装饰阶段)···············································17
- 交房工程
- 基本原则······························································18
- 墙面垂直度(交房阶段)·················································18
- 表面平整度(交房阶段)·················································19
- 空鼓、开裂(交房阶段)·················································20
- 水泥砂浆地面平整度(交房阶段)·········································21
- 阴阳角(交房阶段)·····················································21
- 房间开间/进深(交房阶段)··············································21
- 室内净高偏差(交房阶段)···············································22
- 防水厚度(交房阶段)···················································23
- 防水高度(交房阶段)···················································24
- 室内栏杆高度(交房阶段)···············································24
- 室内栏杆间距(交房阶段)···············································24
- 入户门框正侧面垂直度(交房阶段)·······································25
- 窗框正面垂直度(交房阶段)·············································26
- 公区墙砖垂直度(交房阶段)·············································26
- 公区墙砖平整度(交房阶段)·············································27
- 公区地砖平整度(交房阶段)·············································28
- 公区墙、地砖空鼓(交房阶段)···········································29
- 设备安装篇
8 基本原则·····························································29
8.1 给水管路压槽深度···················································29
8.2 给水管预留洞口或预埋管件定位·····································29
8.2 给水管预留洞口或预埋管件定位·····································29
8.3 套管定位····························································30
8.4 线盒定位····························································30
8.5 给水点定位··························································30
8.6 混水阀冷热水管口中心距············································30
8.7 墙面PPR给水管口预留长度··········································31
8.8 排水立管墙边距·····················································31
8.9 厨房横管、沉水弯、排烟阀标高·····································31
8.10 公区及地下室桥架或管道安装标高···································31
8.11 同一空间内同标高开关、插座面板极差······························32
8.12 消火栓标高·························································32
9 支持性文件·····························································32
10 相关附件·······························································32