ICS 29.240.10 D 13
Record No. J802—2008
Electric Power Industry Standard of the People's Republic of China
P DL / T 5096 — 2008
To Replace DL/T 5096 — 1999 and DL/T 5171 — 2002
Drilling Technical Regulations of Electrical Power Engineering
Issue Date: June 4, 2008 implementation Date: November 1, 2008
Issued by the National Development and Reform Commission of the People's Republic of China
1 Scope
These regulations deal with contents and technical principles of geological drilling, hydro-geological drilling, and geotechnical engineering construction drilling intended for electric power engineering.
They apply to the drilling activities and associated in-situ tests and downhole tests related to electric power engineering.
2 Normative References
The following normative documents contain provisions which, through reference in this text, constitute provisions of this standard.
For dated references, all their subsequent amendments (excluding errors corrected) or revised editions shall not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the normative documents indicated below. For undated references, their latest editions apply.
GB 6722—1992 Safety Regulations for Blasting
GB 9448—1999 Safety in Welding and Cutting
GB/T 16950—1997 Diamond Core Drilling Equipment Conventional System
GB 50021—2001 Code for Investigation of geotechnical Engineering
DL/T 5034—2006 Technical Code for the Hydro-geological Investigation of Electric Power Engineering
3 General
3.0.1 These regulations are formulated to adapt to the needs for exploration activities in electric power engineering, promote progressive development and improvement of drilling techniques used in electric power engineering, ensure project quality and work safety, and enhance economic benefits.
3.0.2 These regulations are developed based on conventional drilling equipment and machineries and common drilling technologies used for engineering exploration presently used in the electric power industry. The operation of various drilling equipment shall not only observe the regulations herein, but also be in strict accordance with the user manuals.
3.0.3 For new technologies, techniques, methods, and equipment not covered herein, technical regulations shall be developed individually based on actual conditions.
3.0.4 The operators of drilling equipment must be workers who have been well trained and passed the examinations in this regard.The workers who have neither been trained nor examined shall not operate alone, and must be accompanied by experienced workers when learning how to operate.
3.0.5 The drilling personnel must fulfill their duties, during which they shall concentrate on work without doing any other things irrelevant to it.
3.0.6 The drilling leader shall participate in the preparation of drilling section of Geotechnical Investigation Specifications and technical proposals of disciplines related to drilling. The drilling workers shall be familiar with the Geotechnical Investigation
Specifications, have a good understanding of the stratum conditions,borehole (well) structure, construction techniques, and sampling methods, and conduct the preparations and constructions in accordance with Geotechnical Investigation Specifications and technical proposals.