河北省工程建设标准
DB13(J)/T300-2019
京津冀统一备案号:J14718-2019
城市综合管廊工程施工及质量验收规范
Code for construction and quality acceptance of urban utility
tunnel engineering
(京津冀区域协同工程建设标准)
2019-03-25发布
2019-07-01实施
河北省住房和城乡建设厅 发布
为全面贯彻习近平新时代中国特色社会主义思想和党的十九大精神,推动京津冀协同发展战略实施,促进城市工程建设高质量发展,北京市住房和城乡建设委员会牵头,会同天津市住房和城乡建设委员会、河北省住房和城乡建设厅联合组织相关单位,经过深入调查研究,认真总结实践经验,参考国内相关标准,在广泛征求意见的基础上,制定本规范。
本规范为京津冀区域协同工程建设标准,按照京津冀三地互认共享的原则,由三地住房和城乡建设主管部门分别组织实施。
本规范根据河北省住房和城乡建设厅《2018 年度河北省工程建设地方标准和标准设计第二批制(修)订计划》(冀建工〔2018﹞44 号)要求制定。主要技术内容包括:1.总则;2.术语;3.基本规定;4.施工测量;5.地基与基础;6.现浇混凝土综合管廊结构;7.装配式综合管廊结构;8.盖挖法;9.浅埋暗挖法;10.矿山法;11.盾构法;12.TBM 法;13.预制顶推法;14.附属构筑物;15.防水工程;16.监控量测;17.机电设备安装;18.监控报警及智慧管理系统;19.综合管廊季节性施工。
本规范在河北省由河北省住房和城乡建设厅管理,由河北省建设工程标准编制研究中心负责日常管理,由中国建筑一局(集团)有限公司负责具体技术内容的解释。
内容索引:
1 总 则····································································1
2 术 语····································································2
3 基本规定····································································4
3.1 施工······································································ 4
3.2 验收······································································ 6
4 施工测量····································································8
4.1 一般规定································································· 8
4.2 控制测量································································10
4.3 定向测量································································11
4.4 平面测量································································13
4.5 高程测量································································19
5 地基与基础······························································· 20
5.1 一般规定································································20
5.2 基坑支护································································20
5.3 基坑开挖································································21
5.4 地基处理································································22
5.5 基坑回填································································23
5.6 质量验收标准··························································· 23
6 现浇混凝土综合管廊结构·············································· 38
6.1 一般规定································································38
6.2 模板分项工程··························································· 38
6.3 钢筋分项工程··························································· 39
6.4 混凝土分项工程·························································40
6.5 现浇结构分项工程······················································ 41
6.6 质量验收标准··························································· 42
7 装配式综合管廊结构···················································· 55
7.1 一般规定································································55
7.2 构件运输································································55
7.3 进场检查与堆放·························································55
7.4 安装与连接····························································· 56
7.5 质量验收标准··························································· 59
8 盖挖法····································································· 62
8.1 一般规定································································62
8.2 支护体系································································62
8.3 盖板体系································································64
8.4 土石方工程····························································· 65
8.5 质量验收标准··························································· 65
9 浅埋暗挖法······························································· 70
9.1 一般规定································································70
9.2 竖井·····································································70
9.3 地层超前支护及加固····················································71
9.4 土方开挖································································72
9.5 初期支护································································72
9.6 二次衬砌································································73
9.7 地下施工作业环境······················································ 74
9.8 质量验收标准··························································· 74
10 矿山法····································································89
10.1 一般规定·······························································89
10.2 洞口、明洞与浅埋段工程··············································89
10.3 岩体(洞身)开挖····················································· 89
10.4 初期支护·······························································90
10.5 二次衬砌·······························································90
10.6 质量验收标准··························································91
11 盾构法····································································95
11.1 一般规定·······························································95
11.2 工作井································································· 96
11.3 盾构掘进·······························································96
11.4 管片拼装······························································97
11.5 同步注浆······························································98
11.6 质量验收标准··························································99
12 TBM 法································································· 107
12.1 一般规定····························································· 107
12.2 TBM 施工工作井·····················································107
12.3 TBM 始发及掘进·····················································108
12.4 非管片支护隧道支护················································· 109
12.5 管片支护隧道························································ 109
12.6 质量验收标准························································ 110
13 预制顶推法·····························································112
13.1 一般规定····························································· 112
13.2 工作井································································112
13.3 后背及后背墙························································ 113
13.4 顶推施工····························································· 113
13.5 管廊顶进····························································· 115
13.6 质量验收标准························································ 116
14 附属构筑物·····························································118
14.1 一般规定····························································· 118
14.2 各类孔口····························································· 118
14.3 质量验收标准························································ 119
15 防水工程······························································· 122
15.1 一般规定····························································· 122
15.2 现浇混凝土综合管廊结构············································ 123
15.3 装配式混凝土综合管廊结构··········································126
15.4 浅埋暗挖法···························································127
15.5 预制顶推法···························································130
15.6 盾构法································································132
15.7 矿山法································································133
15.8 TBM 法······························································ 136
15.9 防水层施工···························································136
15.10 质量验收标准······················································· 138
16 监控量测······························································· 147
16.1 一般规定····························································· 147
16.2 明(盖)挖法监控量测···············································147
16.3 浅埋暗挖法施工监控量测············································ 148
16.4 盾构法施工监控量测················································· 149
16.5 预制顶推法监控量测················································· 150
16.6 矿山法施工监控量测················································· 150
16.7 TBM 法施工监控量测················································ 151
16.8 监测报警····························································· 152
16.9 监测成果····························································· 152
17 机电设备安装··························································154
17.1 一般规定····························································· 154
17.2 支吊架系统···························································154
17.3 通风系统····························································· 155
17.4 供电系统····························································· 155
17.5 照明系统····························································· 157
17.6 给水排水系统························································ 158
17.7 消防系统····························································· 158
17.8 标识系统····························································· 159
17.9 质量验收标准························································ 160
18 监控报警及智慧管理系统··········································· 173
18.1 一般规定····························································· 173
18.2 监控系统····························································· 173
18.3 火灾报警系统························································ 174
18.4 智慧管理系统························································ 174
18.5 质量验收标准························································ 176
19 季节性施工·····························································185
19.1 一般规定····························································· 185
19.2 冬期施工····························································· 185
19.3 高温施工····························································· 187
19.4 雨期施工····························································· 187
附录 A 施工现场质量管理检查记录··································· 189
附录 B 城市综合管廊工程的分部分项工程划分及工程代号·······190
附录 C 检验批质量验收记录············································196
附录 D 分项工程质量验收记录·········································197
附录 E 分部(子分部)工程质量验收记录···························198
附录 F 单位(子单位)工程质量竣工验收记录····················· 199
附录 G 测量技术要求及监测项目······································217
本规范用词说明·····························································226
引用标准名录······························································· 227
附:条文说明······························································· 231