工程名称Works Title :: 工程材料/构配件/设备报审表 sh/t3903-A.9 Works Materials /Components/Equipment Inspection Request 编号Item No : (监理单位) o ( CS/CMC) 我方于年月日进场的工程□材料/构配件□设备数量如下(见附件)。现将质量证 文件及自检结果报上,拟用于下述部位: ,请予以审核。 We have mobilized the following materials /ponents/equipmentfor the works on quantity is listed below ( seethe attachments ) Now ,we submit the quality documents and our self inspection results ,The proposed locations for use as follows : Please review it . 附件Attached : 1数量清单Quantity List ; 2质量证明文件Quality Documents 3自检结果Self Inspection Results 项目经理 Project manager 承包单位(章) 日期 Contractor ( Chop) Date 审查意见Review ments 经检查上述工程□材料/□构配件/□设备,□符合/□不符合设计文件和规范的要求,□准许/ 不准许进场,□同意□不同意使用于拟定部位。 After the inspection ,the above materials ponents /equipment,meet /donot meet the requirements of the design documents and specifications .site mobilization is allowed /sitemobilization is not allowed ,use for the proposed locations allowed not allowed 总/专业监理工程师 Chief /disciplinesupervision engineer 项目监理机构 日期 CS /CMC Date ...
A9工程材料构配件设备报审表.doc