工程名称Works Title : 主要施工设备进场报审表 sh/t3903-.13 Major Construction Equipment Mobilization Approval Request 编号Item No : 致 (监理单位) To ( /CMC) 我方承担的 工程,按合同规定的主要施工设备、机具及检测设备、工具拟进场,并经自检合 格,请查验。 contracted the works ,we are going to mobilize the major construction equipment and tools as well as the inspection equipment and tools specified by the contract ,after the self inspection ,they are on spec please inspect . 附Attached 项目经理 Project manager 承包单位(章) 日期 Contractor ( Chop) Date 审查意见Review ments : 经检查上述施工设备、机具及检测设备、工具,□符合/□不符合施工组织设计文件和相关要求, 准许/□不准许进场。 According to our inspection ,the above equipment ,tools and the inspection equipment and tools meet / do not meet the requirements of the construction organization design documents and other rules ,si mobilization mobilization not allowed . 不准许进场原因如下: The reasons for not allowing site mobilization are listed below : 总/专业监理工程师 Chief /disciplinesupervision engineer 项目监理机构 日期 CS /CMC Date ...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)