监理工程师通知回复单( 类) A5.doc

监理工程师,文档模板
文档页数:2
文档大小:23KB
文档格式:doc
文档分类:文档模板
上传会员:
上传日期:
最后更新:

监理工程师通知回复单(类) 工程名称:长安福特马自达发动机项目餐厅工程 编号:A5_01 致: 重庆联盛建设项目管理有限公司(监理工单位) B22—04号监理工程师通知单的内容完成情况如下(逐条对应写明): ,工序报验已在完善,并报验。The declare of procedure is being advanced and has been declared . 2,土建交接资料已补做。The documents for exchange to CC has been made up 3,对焊缝局部高度,宽度,厚度等严重情况进行现场修复整改。The at -- siterectification is being made to height ,width and thickness of partial serious crack ,对肋板凸出钢梁侧面7MM等已进行了现场整改。At-- siterectification has been adopted to 7mm balance found between rib board and beam . 5,钢梁连接端板,现吊装之前已整改完成,对以前吊装构件进行高空整改。The rectification has been made to beam and bottom connection before rigging ,as the same to those ponents that have been rigged 6,对飞溅物,毛刺,飞边等进行沙皮打磨处理。The polishing has been made to slag ,burr and sharp edge condition . 7,对钢构及零部件切割平面度差,割纹深度大等进行补焊处理。The rectification welding will be adopted to structure and ponents that has poor plane degree and deep welding crack . 8,油漆损坏大,局部有流坠现象,在高空用沙皮打磨后补漆,半成品保护差已通知公司进行保 Any serious damaged coating and partly coating rests should be dealt with polishing in upper-air ,the protection failure for semi-product has been delivered to pany more careful protection 承包单位项目经理部(章): 项目经理: 时间: 项目监理机构签 承包单位签收 收人姓名及时间 人姓名及时间 监理审核意见...

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)