使用与维护 第31卷2013年第1期(总第163期) 发变组保护及并网整定计算 陈晓云罗志敏 (唐钢设备机动部唐山063016) [摘要]介绍了发电机和变压器分别装设单独的纵联差动保护,以提高系统的可靠性及保护的灵敏度,详 述了发电机和变压器的主保护和后备保护的整定计算以及并网整定计算,确保了工程顺利投运和良好稳定的运 行状况. [关键词]发变组保护整定计算主保护后备保护双电源 Generator-transformer Unit Protection and Grid-connected Setting Calculation CHEN Xiao-yun LUO Zhi-min (Equipment and Mechanical-Power Department of Tangshan Iron Steel Co. Ltd. Tangshan 063016) 【Abstract】The generator and the transformer are equipped with a longitudinal differential protection separately to improve the system reliability and protection sensitivity.Describe in detail the setting calculation of grid-connected and the main and backup protection for the generator and the transformer to ensure that they are put into operation smoothly and kept in a stable operation. 【Key words】Generator-transformer unit protection setting calculation main protection backup protection dual power supply 发电机-变压器组(简称发变组)中当发电机升压变在35kV分别并网于1号和2号110kV变电 与变压器之间没有安装断路器时,发电机与变压站.采用发电机-变压器组单元接线,发电机与变 器将保持为成组单元运行.不论是发电机的短路压器之间没有安装断路器.以1号40MW发电机 故障、主变压器的短路故障还是厂用高压变压器 来介绍发变组的继电保护整定计算.系统单线图 的短路故障都必须停机处理.在这种接线情况 如图1所示,系统参数如下: 下,作为保护配置和事故跳闸出口应把它们视作 (1)发变组35kV母线最大最小等值阻抗为 一个扩大的元件进行保护设计. X=2.3217 Xm=3.0329;基准电流I准=19.6...
推荐内容/By 图集吧
- 《新疆工程勘察设计计费导则(2022版)》.pdf
- 云计算研发创新中心消防工程清单及图纸.zip
- 新能源项目项目经济评价边界条件取值表.pdf
- 关于发布2016版20kV及以下配电网工程概预算定额2024年下半年价格水平调整的通知-定额〔2025〕7号.pdf
- 关于发布2022版20kV及以下配电网工程概预算定额2024年下半年价格水平调整系数的通知-定额〔2025〕6号.pdf
- JR/T 0026-2006 银行业计算机信息系统雷电防护技术规范.pdf
- 中建三局各类建筑工程技术经济指标(含计算公式).pdf
- 系杆计算小软件.rar
- 13规范清单计价(2020定额)一般计税(2025安文费)工程项目清单模板.zip
- QC/T 1157-2022 汽车产品单位产量综合能耗计算方法.pdf
- QX/T 148-2011 气象领域高性能计算机系统测试与评估规范.pdf
- SY/T 7492-2020 抽油机井示功图法产液量计算技术规范.pdf