使用与维护 第31卷2013年第1期(总第163期) 发变组保护及并网整定计算 陈晓云罗志敏 (唐钢设备机动部唐山063016) [摘要]介绍了发电机和变压器分别装设单独的纵联差动保护,以提高系统的可靠性及保护的灵敏度,详 述了发电机和变压器的主保护和后备保护的整定计算以及并网整定计算,确保了工程顺利投运和良好稳定的运 行状况. [关键词]发变组保护整定计算主保护后备保护双电源 Generator-transformer Unit Protection and Grid-connected Setting Calculation CHEN Xiao-yun LUO Zhi-min (Equipment and Mechanical-Power Department of Tangshan Iron Steel Co. Ltd. Tangshan 063016) 【Abstract】The generator and the transformer are equipped with a longitudinal differential protection separately to improve the system reliability and protection sensitivity.Describe in detail the setting calculation of grid-connected and the main and backup protection for the generator and the transformer to ensure that they are put into operation smoothly and kept in a stable operation. 【Key words】Generator-transformer unit protection setting calculation main protection backup protection dual power supply 发电机-变压器组(简称发变组)中当发电机升压变在35kV分别并网于1号和2号110kV变电 与变压器之间没有安装断路器时,发电机与变压站.采用发电机-变压器组单元接线,发电机与变 器将保持为成组单元运行.不论是发电机的短路压器之间没有安装断路器.以1号40MW发电机 故障、主变压器的短路故障还是厂用高压变压器 来介绍发变组的继电保护整定计算.系统单线图 的短路故障都必须停机处理.在这种接线情况 如图1所示,系统参数如下: 下,作为保护配置和事故跳闸出口应把它们视作 (1)发变组35kV母线最大最小等值阻抗为 一个扩大的元件进行保护设计. X=2.3217 Xm=3.0329;基准电流I准=19.6...
推荐内容/By 规范库
-
危险性较大的分部分项工程专项施工方案编制指南.docx
-
Q/SY 08246-2024 脚手架作业安全管理规范(能看,不太清晰).pdf
-
重庆市绿色建材分类评价技术导则 (无机保温板材).pdf
-
《石油天然气工程项目用地控制指标》国土咨规 2016 14 号.pdf
-
《工程建设项目货物招标投标办法》国家发改委发布 2015版.pdf
-
【可打印版】计价-24国标清单vs13国标清单差异.pdf
-
中石化 EPC 固定总价清单计价工作指南.pdf
-
【可打印版】计量-建筑与装饰工程-24vs13国标差异.pdf
-
广东省城镇住宅品质提升设计图册(2025).pdf
-
沪消〔2025〕138号附件 消防合规指引手册通用版(试行).docx
-
T/ZEDA 003-2022 螺锁式连接预应力混凝土异型空心方桩技术规程.pdf
-
T/ZEDA 002-2022 端板销钉式连接预应力混凝土异型空心方桩技术规程.pdf