2016年3月下 施工技术 第45卷第6期 CONSTRUCTION TECHNOLOGY 11 D01:10.7672/sgjs2016060011 宁波中国港口博物馆仿生造型测设技术 郑长江,钱鸣,刘用海 (宁波建工工程集团有限公司,浙江宁波315040) [摘要]根据宁波中国港口博物馆复杂仿生建筑结构特点分析其测设难点,依照“从空间转平面,控制安装节点” 的技术思路,从平面尺寸定位控制和异形构件造型控制两方面采取针对性的测设技术措施,工程安装精度达到设 计要求. [关键词]博物馆;仿生建筑;测设技术;平面定位;异形构件 [中图分类号]TU198 [文献标识码]A [文章编号]1002-8498(2016)06-0011-05 Survey and Design Technology of Bionic Structure of Ningbo-China Port Museum Zheng Changjiang Qian Ming Liu Yonghai Ningbo Construction Co.Ltd. Ningbo Zhejiang 315040 China) Abstract:The survey and design difficulties of Ningbo-China Port Museum which was a plex bionic building were analyzed.According to the technology idea of“from space to plane controlling installation joints" survey and design technologies were adopted from two aspects of plane dimension position control and profiled ponent modeling control.The installation accuracy meets the design requirement by these methods. Key words:museums;bionic architecture;survey;plan positioning;special-shaped ponent 1工程概况 2测设难点 宁波中国港口博物馆及国家水下文化遗产保2.1结构概况 护宁波基地工程(简称港口博物馆工程)由3部分 本工程不仅轴线复杂,且为立体曲线造型,内 组成,分别为宁波港口博物馆(A区)、国家水下文 部结构标高高低不一,其采用钢与混凝土组合结 化遗产保护宁波基地(B区)以及后勤办公部分(C 构,需要安装大量预埋件,且预埋件安装需要与钢 D区),如图1所示,建设用地为51966m2 总建筑面 筋模板施工交叉进行.整体造型采用仿生建筑的 积为40987m2 其中地下室建筑面积为2169m2.拟 设计概念,导致大量混凝土及钢构件为异形构件 建建筑物主要为2座3层楼(高度约为35.8m) 及 (见图2),外围构件轴线位置随高度变化而变化. 后勤办公部分,宁波港口博物馆(A区)设地下室 1层. 图2异形构件 Fig.2 Special-shaped ponents 图1建筑效果 Fig.1 Construction effect 2.2难点分析 由于本工程外围护以石材和钛复合板幕墙为 主,整体幕墙结构复杂,幕墙单元需采用工厂预制, [作者简介]郑长江,高级工程师,E...
推荐内容/By 图集吧
- T/CBDA 44-2020 博物馆室内装饰装修技术规程.pdf
- 中国工艺美术博物馆低碳化改造设计.pdf
- 宁波博物馆瓦爿墙施工技术.pdf
- 宁波·中国港口博物馆双曲玻璃穹顶设计与施工.pdf
- JTS/T 311-2023 港口水工建筑物修补加固技术规范.pdf
- JTS 178-2020 港口工程清洁生产设计指南(官网公开版).pdf
- DB21/T 3685-2023 辽宁省港口危险货物企业生产安全应急资源.pdf
- T/GDPAWS 16-2022 博物馆安全生产标准化规范
- 某博物馆单双曲面建筑模板设计与施工
- 彩色高清PDF《景观与建筑设计系列·C3建筑立场系列丛书 48 博物馆 空间体验》韩国C3公社
- 辽宁省博物馆施工生活区平面图
- 彩色高清PDF《中国园林博物馆》北京市建筑设计研究院有限公司EA4设计所