施工技术 2010年1月 86 CONSTRUCTION TECHNOLOGY 第39卷第1期 沈阳东北世贸广场深井井点降水施工技术 张永林 (北京怀建集团有限公司,北京101400) 【摘要]沈阳东北世贸广场设3层地下室,主楼采用钢筋混凝土筏板基础、辅楼采用带有反梁的钢筋混凝土筏板基 础、裙楼采用独立柱基加防水板.基坑面积大,开挖深度较深,降水强度大,采用深井井点降水方案.介绍了井点 布置、挖泥浆池、钻孔、井管安装、排水管网铺设、降水等主要施工工艺,指出降水施工中的注意事项,并制定应急预 案.实践证明,该方案可确保基坑及周边建筑物安全. [关键词]基础工程;深井井点降水;施工工艺;应急预案 [中图分类号]TU753.66 [文献标识码]A[文章编号]1002-8498(2010)01-0086-04 Construction Technology of Deep-well Point Dewatering in Shenyang Northeast World Trade Square Zhang Yonglin Beijing Huaijian Group Co.Lid.Beijing 101400 China) Abstract:Shenyang Northeast World Trade Square has three-layer basement.Reinforced concrete raft foundation is designed for its main building and raft.foundation with upstanding beams is designed for affiliated building as well as individual footing with waterproof plate designed for podium.Because the foundation excavation has characteristics of large area deep excavation and large dewatering intensity deep-well point dewatering technology is adopted.Main construction technologies are introduced such as arrangement of well points excavation of mud pool drilling of holes installation of dewatering pipe-net and dewatering.Furthermore attention points during construction are proposed.It proves that the scheme can ensure the safety of foundation excavation and surrounding buildings. Key words:foundation engineering:deep-well point dewatering construction technology;emergency plan 随着城市建设中的高层及超高层建筑越来越多,局部-19.45m 采用59m×59m、厚4m的大体积钢筋 建筑深基坑地下降水控制的要求越来越高,降水规模混凝土筏板基础.辅楼基底标高为-1...
推荐内容/By 图集吧
- DB4201/T 725-2024 武汉市排水检查井非开挖修复技术规程.pdf
- 完整版 T/CECS 1584-2024 城镇地下排水干渠结构可靠性鉴定标准.pdf
- JY/T 0515-2019 活塞式抽水机模型.pdf
- 紧邻历史建筑的临江深基坑上下同步逆作与变形控制 陈永才.pdf
- QX/T 52-2007 地面气象观测规范 第8部分:降水观测.pdf
- 中建顶管基坑支护施工方案 300页.doc
- DB32/T 4881-2024 排水用塑料检查井应用技术规程.pdf
- JJF(陕) 035-2020 雨滴谱式降水现象仪现场校准规范.pdf
- 中建三局《施工现场断排水标准做法》.pdf
- 罐区排水进度计划.xls
- 甘肃省蓄水排水板等补充定额子目及地区基价 甘建价字〔2024〕16号.pdf
- 高标准产业园区功能区基坑支护及降水工程专项施工方案(增加雨水池、收集池后编制).pdf