2015年5月上 施工技术 第44卷第9期 CONSTRUCTION TECHNOLOGY 119 D0I:10.7672/sgjs2015090119 深圳平安金融中心主塔楼超高施工电梯配置技术* 左强,周予启,史媛,孙若晖,李彦贺 (中建一局集团建设发展有限公司,北京100102) [摘要]深圳平安金融中心主塔楼建筑高度660m 地上118层.结构和装修施工期间,在核心筒内布置6台高速双 笼施工电梯,用于材料和人员的垂直运输.施工后期,依次启用4台正式电梯,分级分层接力,解决施工电梯拆除 后的垂直运输问题.实践证明,本工程电梯布置合理,能满足现场材料运输需要,保证施工顺利进行,结构、装修的 施工工期均在计划之内. [关键词]建筑机械;高层建筑;电梯;垂直运输;正式电梯转换 [中图分类号]TU61 [文献标识码]A [文章编号]1002-8498(2015)09-0119-03 Construction Elevator Configuration Technology of Shenzhen Ping'an Financial Center Building Zuo Qiang Zhou Yuqi Shi Yuan Sun Ruohui Li Yanhe (China Construction First Group Construction Development Co.Lad. Beijing 100102 China) Abstract:The height of Shenzhen Ping'an Financial Center building is 660m and the ground layer is 118.During structure and decoration construction six high-speed double cage construction elevators are arranged in the core barrel used for vertical transport of materials and personnel.At the end of construction period four formal elevators are enabled then the elevators serviced hierarchical relay to solve the problem of vertical transportation after the construction elevators demolition.It proves that the elevators are arranged reasonably and can meet the requirements of on-site materials transportation and guarantee the successful construction.The construction time of structure and decoration are controlled in planned limits. Key words:construction equipment;tall buildings;elevators;vertical transportation;formal elevator conversion 1工程概况 墙单元板块、机电小型设备及零散材料、施工人员 深...
深圳平安金融中心主塔楼超高施工电梯配置技术.pdf