施工技术 2012年8月下 104 CONSTRUCTION TECHNOLOGY 第41卷第371期 深基坑局部钢管降水井法兰片法封堵施工技术 王家法,宋文涛 (江苏省苏中建设集团股份有限公司临沂分公司,山东临沂276000) [摘要]结合临沂铂尔曼酒店工程,根据实际情况对降水方案进行选择,指出降水施工工艺流程,详细讲述了降水 井的设计、施工和封堵技术及其施工中的注意事项.通过临沂铂尔曼酒店深基坑局部降水井施工及封堵技术革 新,降低了地下水位、缩短了工期,满足施工要求.本施工工艺简单方便,可减少施工成本支出,并解决了深基坑降 水难题. [关键词]地下工程;深基坑;降水井;法兰片;止水环;施工技术 [中图分类号]TU753.66 [文献标识码]A [文章编号]1002-8498(2012)16-0104-03 Sealing Technology of Partial Steel Pipe Dewatering Wells with Flange Plate for Deep Foundation Excavation Wang Jiafa Song Wentao Linyi Branch of Jiangsu Suzhong Construction Group Co. Ld.Linyi Shandong 276000 China) Abstract:Combined with the actual construction condition of Linyi Pullman Hotel the dewatering schemes are chosen and the dewatering construction process is put forward.The design construction sealing and attentions of dewatering wells are described in detail.The partial dewatering wells of the foundation excavation and the innovation to deal with the sealing has successfully reduced the groundwater and shorted the construction period.The dewatering method is simple and reduce the construction cost. The dewatering difficulties of deep foundation excavation are solved. Key words:underground;deep foundation excavation;dewatering wells;flange plate;water stop ring;construction 1工程概况 水的粉质黏土含水层,原设计降水不能满足要求, 临沂铂尔曼酒店位于山东省临沂市兰山区滨在电梯井坑周围和坑中增加18口井点降水井. 河大道西侧,三河交汇处,地下水丰富,地质条件复2降水方案选择 杂.本工程主楼地下3层、地上34层、主楼总高度 针对施工中遇到的难题,原计划在电梯井坑周 143.8m;采用框架-核心筒结构,为800mm嵌岩钻 围采用止水帷幕施工,但考虑到止水帷幕施工周期 孔灌注桩加1900mm厚筏板基础.本工程为临沂 长、成本高,故取消该方案.通过计算在...
推荐内容/By 图集吧
- 高标准产业园区功能区基坑支护及降水工程专项施工方案(增加雨水池、收集池后编制).pdf
- 污水管网钢板桩深基坑开挖专项施工方案(52页专家论证) .pdf
- [广州]污水管网工程钢板桩支护专项施工方案 .pdf
- 中建 土方开挖、基坑支护、降水工程专项施工方案(排桩/锚索形式).zip
- 中建 土方开挖、基坑支护、降水工程专项施工方案(支护桩/内支撑形式).zip
- 中建 土方开挖、基坑支护、降水专项施工方案(地连墙/内支撑形式).zip
- 中建基坑支护降水专项施工方案 含土方开挖、基坑支护、降水专项施工方案(地连墙/内支撑形式).zip
- 深基坑工程风险管控要点及典型事故剖析.pptx
- 基坑支护、降水及土方安全专项施工方案 125页.docx
- 基坑支护、降水及土石方工程施工方案 180页.doc
- 消防水池深基坑专项安全施工方案 80页.docx
- 土方开挖、降水、基坑支护及监测安全专项施工方案 80页.docx