2014年4月上 施工技术 第43卷第7期 CONSTRUCTIONTECHNOLOGY 15 DOI:10. 7672/sgj82014070015 软土地基下不同埋深深基坑分期施工技术 陈天伟,马怀章,汪仲琦 (中建八局第三建设有限公司,江苏南京210046) 【摘要】无锡云蝠大厦工程分两期施工,在地下室深度不同的情况下,通过对工程地质情况和施工条件的分析,主 要针对基坑支护和地下水处理进行研究,制定解决方案,最终形成了软土地基下不同埋深并且分两期施工的深基 坑施工技术,并取得了良好的效果。
[关键词]地基;软土;深基坑;支护;地下水;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号】1002-8498(2014)07-0015-03 DeepFoundationExcavationConstructionTechnologybyTwoStages inDifferentDepthinSoftSoil ChenTianwei,Ma Huaizhang,WangZhongqi (The Third Construction Co.,Lad.of China Construction Eighth Engineering Division,Nanjing,Jiangsu 210046,China) Abstract:Wuxi Yunfu Building is constructed by two stages.In different depth of basement,the authors made research on foundation excavation supporting and treatment of groundwater and made up solution method according to the analysis on construction conditions.At last,the deep foundation excavation construction technology by two stages in different depth in soft soil foundations was formed and good effect was obtained. Key words;foundations; soft soil;deep foundation excavation;supports;groundwater;construction 无锡属于典型的软土地区,土质具有含水量 础,地下室及地上为框架结构。
地下2层为汽车库, 高、压缩性大、透水性差和流变性强等特点,本文以 地下1层和地上1层为商业步行街,2层及以上为 无锡云蝠大厦工程为例,介绍了软土地区分两期施 餐饮业和专卖店,崇安寺步行街已建成并开始营 工且深浅不同的深基坑土方开挖、基坑支护、地下 业。
一、二期地下室相连,但是地下室深度不同,二 水处理等施工技术。
期地下室底板混凝土标高为-14.800m,比一期已 1工程概况 建地下室深1层,高差达到4.4m,给二期深基坑施 无锡云蝠大厦位于无锡市核心商圈崇安寺二 工带来很大难度,同时相邻已建步行街建筑地基安 期地块,西邻中山路,东接城中公园,北靠城中公园 全成深基坑开挖的最大挑战。
西人口广场,南依崇安生活广场一期步行街西人 口。
本工程为超高层综合建筑,占地面积11000m², 一期地上建筑 安寺步行云幅大厦 总建筑面积为101099.00m²,其中地下1层至地上4 街地下室 (十期地块1200(期地块) 地下室 层为商业区,地上5~48层为办公和酒店,地下2~ 地下层】 3层为停车场,建筑高度248.5m,地下室底板标高 地下204 为-14.800m。
14800 地下室北侧与一期地块所建崇安寺步行街连 接,如图1所示,一期工程地下室2层,地上6层,地 下室底板标高-10.400m,一期工程为筏板加桩基 图1一、二期连接示意 Fig.1 Connection of first and [作者简介]陈天伟,工程师,E-mail:skyetw@163. second phase project [收稿日期]2013-08-23 万方数据
16 施工技术 第43卷 2工程特点及难点分析 2.3地下水丰富 2.1工程地质条件 根据地质勘察结果和一期施工情况来看,地下水 工程位于无锡市区,场地属长江三角洲冲积平 比较丰富,水位较高,水压较大,不利于深基坑开挖。
原。
场地位于老城区,浅部有较厚杂填土且填料复 地质勘察结果显示水位标高在-1.100~-2.320m, 杂,杂填土以下主要为粉质黏土、粉土、淤泥...