2010年2月 施工技术 第39卷第2期 CONSTRUCTION TECHNOLOGY 21 上海世博会世博轴索膜结构张拉过程监测分析 张吉顺1,陈鲁,张其林2,李大林2 (1.上海同济建设工程质量检测站,上海200092;2.同济大学土木工程学院,上海200092) [摘要]介绍上海世博会世博轴膜屋面索膜结构施工过程安全性监测方面的研究,包括膜屋面中枪杆水平素索力 以及边枪杆背索索力在张拉过程和张拉完毕后的监测过程和监测数据,以及膜面张力在张拉过程和张拉完毕后的 监测过程和监测数据,对监测测量数据进行分析,保证工程质量. [关键词]上海世博会;世博轴;索膜结构;安全性监测:索力测量;膜面张力测量 [中图分类号]TU393 [文献标识码]A [文章编号]1002-8498(2010)02-0021-03 Monitoring Analysis on Tensioning Construction Process of Cable and Membrane Structures of Expo Axis in Expo 2010 Shanghai China Zhang Jishun' Chen Lu' Zhang Qilin2 Li Dalin2 (1.Shanghai Tongji Construction Quality Inspection Station Shanghai 200092 China; 2.School of Cisil Engineering Tongji University Shanghai 200092 China) Abstract:The authors introduce the health monitoring study on cable and membrane structures of Expo Axis in Expo 2010 Shanghai China which includes monitoring procedure and monitoring data during and after tensile construction of middle masts side masts and membrane force.And parision of the monitoring data is done to draw an conclusion which is very important for the asscessment of project quality. Key words:Expo 2010 Shanghai China;Expo Axis;cable and membrane structure;health monitoring; cable force measurement;membrane force measurement 世博轴膜屋面投影尺寸达80mx1000m 计算位连的水平拉索索力.同时,采用应变片测试方法,监测 移超过3m 计算应力比接近1.0,无论规模之大,还是与边桅杆相连的背索索力. 安全储备的不确定性均为罕见.膜结构的设计计算结 分为南北两段进行张拉.张拉3根中柱水平索其 果建立在明确的初始状态膜面预应力基础上,不同的 中1根.南段共有11根中柱,北段有8根中柱.张拉 初始状态膜面应力将可能导致完全不同的结构正常使 时,首先张拉南段,其次张拉北段.每段张拉时,各中 用和极限状态设计结果. 柱被张拉水平索同时张拉.张拉过程分3级:...
上海世博会世博轴索膜结构张拉过程监测分析.pdf
