2016年2月上 施工技术 第45卷第3期 CONSTRUCTION TECHNOLOGY 119 DOI:10. 7672/sgjs2016030119 上海中心大厦深基坑顺逆结合后浇带施工技术 唐强达,吴 (上海建科工程咨询有限公司,上海200032) [摘要]上海中心大厦深大基坑采用主楼顺作与裙房逆作相结合的总体施工方案,在主楼及裙房地下室之间设置 沉降后浇带。
介绍了地下室顺逆结合后浇带部位关键节点处理措施,结合实测沉降数据对后浇带封闭条件进行分 析,重点阐述了后浇带地下防水节点处理措施及后浇带封闭施工技术。
[关键词]高层建筑;深基坑;后浇带;逆作法;施工技术 [中图分类号]TU974[文献标识码】A[文章编号】1002-8498(2016)03-0119-04 Top-down andDown-top ConstructionTechniqueforPost-pouring Band ofDeepFoundation Excavation at Shanghai Tower Tang Qiangda,Wu Tao (Shanghai Jianke Engineering Consulting Co.,Lad.,Shanghai 200032,China) Abstract:Shanghai Tower as the tallest building under construction in China, the general construction scheme for its deep and large foundation of main block and podium is the bination of top-down and down-top method. The post-pouring band is set between basements of main block and podium, whose location is determined according to the locations of top-down enclosure walls of main block and ring supporting structure. In view of the construction conditions of post-pouring band in Shanghai Tower, handling methods of key joints of post-pouring band are given in this paper,the enclosure conditions of post-pouring band are analyzed bining withmonitoring setlement data,technical treatment measures for underground waterproof joints of post-pouring band and enclosure construction technique of post- pouring band are mainly discussed. Key words; tall buildings; deep foundation excavation; post pouring belt;reverse construction method; construction 0引言 心。
其四周均为城市主干道,地下管线众多,周边 后浇带作为减小超长结构混凝土伸缩裂缝和环境极其复杂。
主楼基坑为内径121m的圆形基 高层建筑主楼与裙房差异沉降的处理措施,在实际坑,采用顺作法施工;外围裙房基坑为不规则四边 工程中已得到普遍应用。
若后浇带设置及施工措形,采用逆作法施工。
主楼地下室顺作与裙房逆作 水渗漏的关键部位,从而对基础结构的整体受力和 除后设置沉降后浇带。
变形产生不利影响。
本文结合上海中心大厦地下 基坑工程采用了塔楼区顺作、裙房区逆作相结 室后浇带设置及封闭全过程,对深基坑顺逆结合部合的方案,将基坑分为主楼区和裙房区2个分区基 位后浇带施工技术进行介绍。
坑。
基坑总面积约34960m²,共设5层地下室,塔楼 1工程概况 区基坑开挖深度31.2m,局部33.2m;裙房区基坑开 上海中心大厦位于上海浦东陆家嘴中心商业 挖深度26.7m。
主楼结构出±0.000后再逆作施工 区,地上建筑高度632m,毗邻金茂大厦、环球金融中 裙房基坑。
主楼基坑围护采用1.2m厚地下连续 墙,墙深50m,水平支撑为6道环形支撑;裙房基坑 [作者简介]唐强达...