施工技术 2014年3月下 30 CONSTRUCTION TECHNOLOGY 第43卷第6期 D0I:10.7672/sgjs2014060030 人民日报社报刊综合业务楼深基坑监测技术方案分析 潘建伟,李哲琳,王勇 (中国新兴建设开发总公司,北京100039) [摘要]在分析人民日报社报刊综合业务楼工程基坑特征的基础上,确定了基坑变形监测技术方案,总结了基坑监 测基准点、工作点及监测点的埋设要求,满足了工程对监测方法、频率、精度等的要求,同时对观测数据处理进行了 描述.通过有效的监测方案保证了基坑边坡、周边建筑物和道路、管线始终处于安全受控状态. [关键词]高层建筑:监测;深基坑:位移;沉降 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2014)06-0030-03 Analysis of Monitoring Programme for Deep Foundation Excavation in the People's Daily Project Pan Jianwei Li Zhelin Wang Yong China Xinxing Construction Derelopment General Co. Beijing 100039 China) Abstract:Based on the characteristics of deep foundation exeavation of the People's Daily project the monitoring scheme for the foundation excavation is obtained and the laying requirements of the monitoring reference point operating points and inspecting points are summarized to meet the project requirement at the method precision frequency aspect meanwhile the monitoring data treatment is also described. The safety of foundation excavation slope surrounding buildings roads pipelines is controlled by the effeetive monitoring. Key words:tall buildings monitoring;deep foundation excavation;displacement;settlement 1工程概况 3.1桩顶水平位移监测 人民日报社报刊综合业务楼工程主要由报刊 3.1.1基准点布设 综合业务楼、图书馆及学术交流中心组成,报刊综 拟在建筑区影响范围外布设3个永久性位移观 合业务楼地下3层,地上32层. 测基准点G1~G3 在基坑周围布设8个位移工作基 基坑南侧有民4,民5,民6,民11楼;基坑北侧 准点(编号分别为J1~J8).且埋设在距离工程 有民20甲、民20乙、老干部活动中心、机械工业学 100m以外,通视良好,穿越冻土层,不易被破坏而且 院招待所;基坑东侧有北区食堂、5号楼,基坑西侧 位置稳定. 为金台西路. 3.1.2监测点布设 本工程开挖深度约为20m 属于深基坑工程,采 位移监测点布设在护坡桩桩顶和冠梁上,基坑...
推荐内容/By 图集吧
- 中建雨污分流改造深基坑专项施工方案(论证后修改版) 270页.docx
- 中建顶管基坑支护施工方案 300页.doc
- 鑫龙汉江一号项目深基坑专项施工方案.pdf
- 中建八局《施组方案管理制度及工作要点宣贯》.pdf
- 中建三局《基坑支护施工方案创效经验分享》.pdf
- 罐基础施工方案.doc
- 高标准产业园区功能区基坑支护及降水工程专项施工方案(增加雨水池、收集池后编制).pdf
- 关于在重点工程项目中大力实施以工代赈促进当地群众就业增收实施方案.docx
- 兰州住宅楼深基坑支护及土方开挖专项施工方案(93页定稿) .pdf
- 地铁站深基坑工程明挖专项施工方案196页图文丰富 .pdf
- 超深基坑施工专项方案(专家论证版) .pdf
- 贵阳基坑开挖及边坡支护工程安全专项施工方案(63页内容丰富) .pdf