2015年10月上 施工技术 第44卷第19期 CONSTRUCTION TECHNOLOGY 113 D0I:10.7672/8js2015190113 六步双侧壁导坑施工步序优化分析 李凌宜1,董亥兴,阳文华1,阳军生2,石宇2 (1.北京市政路桥股份有限公司,北京100068;2.中南大学土木工程学院,湖南长沙410075) [摘要]依托长沙市轨道交通2号线某工程,结合现场实际,对传统的双侧壁导坑法施工步序进行优化调整设计, 在数值分析的基础上,比较2种不同的开挖步序对围岩和支护结构的位移以及工字钢内支撑的内力进行比较分 析,得到优化改进后的双侧壁导坑施工工序是可行的. [关键词]隧道工程;地铁;双侧壁导坑法;优化:数值分析 [中图分类号]U455.4 [文献标识码]A [文章编号]1002-8498(2015)19-0113-04 Optimization Analysis of Construction Process of Double Side Slope Method by Six Steps Li Lingyi' Dong Haixing' Yang Wenhua' Yang Junsheng? Shi Yu2 (1.Beijing Municipal and Highway Bridge Co. Lid.Beijing 100068 China;2.School of Ciril Engineering Central South Unirersity Changsha Hu'nan 410075 China) Abstract:Based on some project of Changsha Rail Transit Line 2 bined with the actual conditions the traditional existing double side slope method construction step sequence was optimized and adjusted. Based on the numerical analysis this paper pared the displacement of surrounding rock and support structure with two different exeavation step sequence analyzed the internal force of I-shaped section steel support.Results show that the improved double side wall pilot tunnel construction process is feasible. Key words:tunnels;subways;double side slope method;optimization;numerical analysis 0引言 围岩的扰动. 文献[14]所提到的双侧壁导坑的开挖顺序1工程概况 为:左侧壁上导坑开挖及初支→左侧壁下导坑开挖 湾镇站停车区间位于枫林路与深湾路交叉 及初支一→右侧壁导上坑开挖及初支→右侧壁下导 路口,靠枫林路北侧设置.枫林路地面现状为双向 坑开挖及初支→中导坑上部环形台阶开挖及拱部 六车道,车流量较大;湾镇为双向四车道,车流量 初支→中导坑核心土开挖,中导坑上台阶开挖一→中 较小.站前停车线区间采用明暗挖相结合的方法 导坑下台阶...
推荐内容/By 图集吧
- DB37/T 5233-2022 土岩双元基坑支护技术标准(公开版).pdf
- 基坑开挖、支护及降水工程施工方案-八局青岛-达观天下1-6楼及三期地下车库项目.docx
- 姚江大桥基坑支护专项安全施工方案(中建八局 G228陆埠互通及S319丈亭互通建设工程).pdf
- 珠江新城中心城区深基坑支护及岩土开挖技术.pdf
- 沿海滩涂地区深基坑支护技术.pdf
- 仙居抽水蓄能电站下水库进出水口基坑开挖技术.pdf
- 大跨径隧道双上侧壁导坑法施工技术.pdf
- 八车道连拱隧道围岩内部位移监测分析.pdf
- 滨海浅滩地区土岩组合地层深大基坑支护技术.pdf
- 基于灰色系统理论的深基坑支护方案优选.pdf
- 邻近基坑施工对某住宅楼影响数值分析研究.pdf
- 联想总部(北京)园区项目二期投标方案基坑支护优化设计分析.pdf