施工技术 2014年5月上 86 CONSTRUCTION TECHNOLOGY 第43卷第9期 D01:10.7672/js2014090086 内爬式塔式起重机高空拆除及换塔施工技术 张肇庆,吴建青2,郭华法2,吕兆健,宫静静 (1.中建一局集团第五建筑有限公司,北京100024;2.义乌市建筑工程质量监督站,浙江义乌322000) [摘要]义乌世贸中心项目由4栋塔楼及5层裙房组成.由于该地区雨季时间跨度大,易受大雨及台风影响,给施 工带来较大难度.通过超高层酒店起重设备的更换、选型、布置和安装,对超高层建筑大型起重机械的相关技术进 行了研究.详细深入分析了内爬升式塔式起重机高空拆除的原因,详细介绍了塔式起重机更换施工技术.塔式起 重机更换完成后,施工速度大大加快,且消除了原有塔式起重机的诸多安全隐患. [关键词]高层建筑;塔式起重机;更换;基础 「中图分类号1TU74 [文献标识码]A [文章编号]1002-8498(2014)09-0086-05 Removal of Inner Climbing Tower Crane and Replacing Technology Zhang Zhaoqing Nu Jianqing2 Guo Huafa2 LǚZhaojian' Gong Jingjing (1.China Construction First Group the Fifth Construction Co.Ltd.Beijing 100024 China; 2.Yiwu City Construction Engineering Quality Supervision Station Yicu Zhejiang 322000 China) Abstract:The Yiwu World Trade Center project consists of four tower buildings and five-layer annex. Because the rainy season is rather long in this area the heavy rains and typhoons can easily affect the project which brings great difficulty to construction.This paper researches technology for large hoisting machines of super-high-rise buildings from tower cranes replacing selection layout and installation technology of super-high-rise buildings.The removal causes of inner climbing tower crane are analyzed. Moreover the replacing technology of tower crane is introduced.After the tower crane replacing the construction speed is more greatly accelerated and many of the safety hazards for original tower crane are eliminated. Key words:tall buildings;tow...
推荐内容/By 图集吧
- 中建合同范本 08塔式起重机维护保养合同.doc
- 中建合同范本 07塔机租赁及服务合同.doc
- 中建合同范本 04起重机安装拆卸合同.doc
- 中建塔吊布置注意事项及常见隐患分析.pdf
- 中建塔吊选型方案.pdf
- 中建塔吊基础选型方案.pdf
- 动臂塔吊安装方案.zip
- 塔式起重机钢结构损伤诊断技术 阎玉芹,宋世军,史常胜,刁训林著 14102566.pdf
- 塔吊定位及基础专项施工方案 170页 2024年编制.docx
- 塔机附着施工方案word附计算书.docx
- 2024版《塔式起重机安全检查与维护指引图册》ppt108页.pptx
- 2024版《塔式起重机安全检查与维护指引图册》培训ppt100页.pptx