2017年9月下 施工技术 第46卷第18期 CONSTRUCTION TECHNOLOGY 107 D0I:10.7672/5j52017180107 商业综合体深基坑支护设计及施工技术 李建雄,梁超1,周立1,马磊,柴木叶2 (1.内蒙古工业大学土木工程学院,内蒙古呼和浩特010051;2.内蒙古银行股份 有限公司,内蒙古呼和浩特010010) [摘要]介绍了在桩锚联合支护体系下,深基坑施工过程中,由于设计变更对施工方案进行了调整和优化,并通过 有限元软件的受力性能分析及验算,在保证基坑施工安全稳定性的前提下实现了经济性. [关键词]基坑;深基坑;错索;桩;有限元分析 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2017)18-0107-03 Design and Construction of Deep Foundation Excavation Supporting Technology in Commercial Complex LI Jianxiong' LIANG Chao' ZHOU Li' MA Lei' CHAI Muye? (1.Civil Engineering Institute Inner Mongolia University of Technology Hohhot Inner Mongolia 010051 China; 2.Bank of Inner Mongolia Co.Ltd.Hohhot Inner Mongolia 010010 China) Abstract:Under the pile anchor bined support and in the process of deep foundation excavation construction due to design changes to the construction scheme for the adjustment and optimization are introdueed.Through the finite element software of mechanical performance analysis and calculation under the premise of ensuring the safety and stability of foundation exeavation construction the economy is realized. Key words:foundation excavation;deep foundation excavation;anchor rope;piles;finite element analysis 商业综合体通常基坑开挖面积大,深度深,而 北 周边建筑密度往往比较大,因此做好该类基坑支护 大唐国际 V区区 工程的设计施工,确保基坑安全和稳定尤为重要. 拟建酒店 1工程概况 (26) V区 呼和浩特市时代广场商务中心项目位于新华 西 拟建公寓A拟建公寓B 东 (29)1V区(28) 西街以北,新华广场以东.拟建项目为框架剪力墙 高层公共建筑高层酒店1区 (22) (18) 结构,包括3层地下室和地上26层的酒店、29层的 新华大街 南 公寓A、28层的公寓B 如图1所示.本工程基坑开 图1基坑平面布置 挖东西长约184m 南北宽约165m 拟开挖深度约在 Fig.I Layout of foundation exc...