2016年4月下 施工技术 第45卷第8期 CONSTRUCTION TECHNOLOGY 103 D0I:10.7672/8js2016080103 微凸支点智能控制顶升模架在华润总部大厦 工程中的优化与应用 陈凯,钟伟,胡建宏,许超,桂芳,陈汉彬 (中建三局集团有限公司,广东深圳518000) [摘要]华润总部大厦采用微凸支点智能控制顶升模架(简称凸点顶模)进行核心筒施工.该技术具有以下亮点: 钢平台系统采用双层桁架结构、支撑架过斜墙段设计、采用轻质高强铝合金挂架和模板等.重点介绍了顶升前准 备、试顶升上支撑架、上支撑架顶升就位、试提升下支撑架、下支撑提升就位等施工工艺. [关键词]高层建筑:核心筒;凸点顶模;同步顶升;施工技术 [中图分类号]TU755.2 [文献标识码]A[文章编号]1002-8498(2016)08-0103-03 Optimization and Application of Bump Jacking Formwork in Huarun Headquarters Building Chen Kai Zhong Wei Hu Jianhong Xu Chao Gui Fang Chen Hanbin China Construction Third Engineering Bureau Co.Lid.Shenzhen Guangdong 518000 China) Abstract:Huarun Headquarters Building applies bump jacking formwork for core tube construction.This technology has characteristics that steel platform applies double-layer truss structure support frame design crossing oblique wall structure it applies light and high strength aluminum alloy hanging frame and formwork and so on.The construction technologies of preparation before lifting pre-lifting upper supports lifting in place of upper supports pre-lifting lower supports lifting in place of lower supports are introduced in detail. Key words:tall buildings;core tube;bump jacking formwork synchronous lifting;construction 0引言 效果及整体结构如图1所示. 近年来,随着超高层建筑的飞速发展,诞生了 一种新的模架体系——顶模,该技术有别于爬模工 艺,在工期保证方面,更具优势,彻底改变了核心筒 施工滞后于外框架的局面,逐渐成为超高层建筑主 体结构施工的潮流和首选.顶模形似一个巨型钢 罩,罩在塔楼核心筒上,又按其支点形式,分为常规 低位顶模和凸点顶模. 1工程概况 华润总部大厦位于深圳后海湾,总建筑面积 19.2万m2 地上66层,地下4层(含1个夹层),采 用密柱钢框架核心筒结构体系,塔楼标准层平面为 一个规则的圆形(核心筒为方形),在立面结构上先...
推荐内容/By 图集吧
- 重庆国金中心低位顶升模架设计.pdf
- 广交会大厦核心筒分片式爬模施工技术.pdf
- 基于智能集成平台的核心筒斜墙段施工关键技术研究与应用.pdf
- 华润总部大厦项目凸点顶模支承系统研究与应用.pdf
- 天津高银117大厦水平结构施工节奏管理研究.pdf
- 微凸支点智能控制顶升模架在华润总部大厦工程中的优化与应用.pdf
- 天津高银117大厦新型抗侧移模块化低位顶升钢平台模架体系设计关键技术.pdf
- 模块化低位顶升钢平台模架体系装配式空间钢桁架平台设计与试验研究
- 华润总部大厦钢结构安装与凸点顶模协同施工技术.pdf
- 模块化低位顶升钢平台模架体系在超高层建筑施工中的应用管理
- DBJ50/T 268-2017 模块化低位顶升钢平台模架体系施工技术标准