施工技术 2011年10月下 34 CONSTRUCTION TECHNOLOGY 第40卷第351期 抢风岭隧道斜井设置与施工控制 黄启贵,富志强,冯冠宙,周委 (中交一公局第三工程有限公司,北京101102) [摘要]以荣(成)乌(海)高速公路抢风岭隧道为例,介绍了在复杂地质条件下特长隧道开通施工斜井的必要性、 斜井施工的特点与难点.从选址、方案比选、参数设计、经济合理性、防排水防护、下穿省道、交叉口施工及协调工 作面等方面,对斜井施工方法及控制要点进行了详细论述.结果表明,施工质量得到保证,工期进一步缩短. [关键词]隧道工程;斜井;施工;控制 [中图分类号]U455.4[文献标识码]A [文章编号]1002-8498(2011)20-0034-03 Inclined Shaft Setting and Construction Control of Qiangfengling Tunnel Huang Qigui Fu Zhiqiang Feng Guanzhou Zhou Wei (The Third Engineering Co.Ld.of the First Highway Engineering Bureau of CCCC Beijing 101102 China) Abstract:Based on Qiangfengling tunnel on Rongcheng-Wuhai Highway the necessity of inclined shaft is introduced in super-long tunnel under plex geological conditions as well as characteristics and difficulties of inclined shaft.The construction methods and control points of inclined shaft are introduced from location scheme parison parameter choice economic rationality and waterproof and drainage protecting.The result shows that the construction quality is ensured and the construction period is shortened. Key words:tunnels;inclined shaft;construction;control 1工程概况 3)斜井下穿S203省道,交通流量大,必须保证 抢风岭特长隧道全长5495m 是荣(成)乌(海)施工及省道运输车辆安全. 高速灵丘至山阴段的控制性工程,该隧道灵丘端寒武 4)斜井处工作面多,洞内交通流量大,须合理 系、奥陶系、石炭系、侏罗系及第四系地层岩组均有分设置避让车道,保证交通畅通与安全. 布,在施工过程中遇到严重浅埋偏压地段、小煤窑采3斜井设置 空区坍塌冒顶等情况,并有涌水现象发生.进口段V3.1选址 级浅埋和V级围岩地段比例大,右洞长846m 左洞长 1)距离主洞口位置在未施工斜井前,工程进 920m.开工前期施工开挖只能采取超短台阶施工,每度面临较大压力.经过5个多月施工,主洞总计进 循环施作一钢拱架,一天施工两循环进尺1.0~ 洞不足300m 无法按合同工期要求完成,所以在距 1.2m 进尺速度缓慢,难以在19个月的合同...
推荐内容/By 图集吧
- 广东省铁路工程施工管理标准化指南 第四分册 隧道工程.pdf
- 隧道超欠挖控制新技术.pptx
- 中国中铁《盾构法隧道施工安全管理》三.pdf
- 中国中铁《盾构法隧道施工安全管理》二.pdf
- 中国中铁《盾构法隧道施工安全管理》一.pdf
- 隧道专项施工方案 2020年编制 240页.docx
- 广渠路东延地下管廊竖井及矩形顶管专项施工方案(中建八局 广渠路东延道路工程5标段隧道工程).docx
- T/CI 085-2023 公路隧道瓦斯工区作业设备安全技术规范.pdf
- 武汉老黏土地层土压盾构适应性研究.pdf
- 斜井盾构地下可拆解结构形式研究.pdf
- 斜井盾构原位无扩大硐室地下拆解技术研究.pdf
- 小曲线半径隧道无铰接盾构施工技术.pdf