2011年4月上 施工技术 第40卷第338期 CONSTRUCTION TECHNOLOGY 27 某17m深基坑工程综合支护技术 王銮学,王文玲2,纽爱涛2 (1.中广核工程有限公司,广东深圳518031;2.北京博大经开建设有限公司,北京100176) [摘要]某工程深基坑支护长度398m 支护深度约12.9-15.4m.根据工程特点,采取在东、北两侧采用微型柱加 锚索土钉墙支护,在南侧选用两级故坡加土钉墙支护的方式.介绍了基坑支护方案设计,详细介绍了微型桩、土钉 墙及预应力锚杆的施工工艺.位移监测数据显示,基坑支护处于稳定状态,未出现超出设计范围的变形现象. [关键词]深基坑;微型桩;锚索:土钉墙;预应力错索 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2011)07-0027-03 Comprehensive Bracing Technology in 17 Meters Deep Foundation Excavation Wang Luanxue' Wang Wenling? Niu Aitao? (1.China Nuclear Power Engineering Co.Ltd.Shenzhen Guangdong 518031 China; 2.Beijing Boda Jingkai Construction Co.Led.Beijing 100176 China) Abstract:The supporting length of some deep foundation is 398 meters and the depth is about 12.9~ 15.4 meters.Based on characteristics of engineering mini piles and anchor soil-nailling wall are used in east and north side meanwhile soil-nailing wall is adopted in south side.Design of foundation excavation supporting is introduced and construction technique of mini piles anchor soil-nailling wall and prestressed anchor are introduced in detail.According to monitoring data foundation excavation is at stable state and deformation is under control. Key words:deep foundation excavation;mini piles;anchor soil-nailing wall;prestressed anchor 1工程概况 场地内混合地下水埋深在3.80-4.90m 根据 本工程位于深圳市某科技园区内,占地面积其赋存介质和埋藏条件分为2类:①赋存于第四系 3580.58m2 总建筑面积77388.59m2 地下4层,深残积砾质粉质黏土及全风化粗粒花岗岩层中的少量 度达17.0m 地上25层,建筑总高度99.55m.本工孔隙水,透水性较差,属弱含水;②赋存于基岩强、 程±0.000相对绝对高程29.95m 基础为桩承台底中、微风化层中的裂隙承压水,其含水量及透水性主 板基础,...
推荐内容/By 图集吧
- BJJT0001-2011 北京市城市道路挖掘回填技术规程.pdf
- 紧邻历史建筑的临江深基坑上下同步逆作与变形控制 陈永才.pdf
- 中建顶管基坑支护施工方案 300页.doc
- 中建二局《设计管理优化培训汇报材料-基坑支护及桩基》课件.pdf
- 基坑支护难点400问 精选第二册.pdf
- 基坑支护难点400问 精选第一册.pdf
- 中国建研院 边坡支护难点400问 精选第二册.pdf
- 中国建研院 边坡支护难点400问 精选第一册.pdf
- 安装工程管道挖土方计算表管道挖土方计算表.xls
- 中建三局《基坑支护施工方案创效经验分享》.pdf
- 中建二局《土方回填及车库顶板承载施工方案及相关安全计算》课件.pdf
- 黄上进、邓南-水泥搅拌桩与钻孔灌注桩组合支护结构在潮汕地区基坑工程中的应用.pdf