施工技术 2014年1月下 10 CONSTRUCTION TECHNOLOGY 第43卷第2期 D0I:10.7672/8gjs2014020010 某体育场巨拱结构高空倾斜偏转提升技术* 郅栓明,张永军,颜琳婷,杨凯 (内蒙古兴秦建筑有限责任公司,内蒙古鄂尔多斯017000) [摘要]鄂尔多斯市东胜全民健身活动中心体育场巨拱结构受力体系复杂,施工难度大.由于受运输和整体吊装 因素限制,重点介绍了巨拱的高空倾斜偏转提升施工工艺和安装方法,以及采取的质量控制措施以满足施工要求, 该技术节能、环保且能降低成本. [关键调]体育场;拱结构;高空倾斜;偏转;提升;施工技术 [中图分类号]TU758.1”[文献标识码]A [文章编号]1002-8498(2014)02-0010-04 Arch Structure Lifting Technology to Enhance the Aerial Oblique Deflection of a Stadium Zhi Shuanming Zhang Yongjun Yan Linting Yang Kai Inner Mongolia Xingtai Construction Co.Ltd.Erdos Inner Mongolia 017000 China) Abstract:For large stadium giant arch structure the stress system is extremely plex and it is difficult for construction.Due to transportation and the overall lifting constraints the arch structure lifting technology to enhance the aerial oblique deflection and installation methods were introduced in detail as well as the quality control measures.This technology was energy-saving environmental and could save cost. Key words:stadiums;arch structure;aerial oblique;deflection;lifting;construction 1工程概况 用起重机进行吊装高空焊接.中间3个单元采用地 鄂尔多斯市东胜全民健身活动中心体育场造面焊接拼装,组拼完成后用液压同步提升进行吊装 型新颖、气势宏大,其主要受力构件巨拱顶面标高提升(长180m 重1600t).将其提升到设计高度后 为129m 跨度330m 总质量2600t 拱与垂直面角进行倾斜偏转至设计要求的6.1°,再与两个边单元 度呈6.1°.本工程首次将桥梁工程中的索拱结构进行空中拼接合龙及预留后装杆件的安装.此种 巧妙地应用到建筑工程中,且拱与地面垂线倾斜方法将有效地降低安装施工难度,节约成本,且质 6.1°,受力体系极其复杂,施工难度较大.由于受运量、安全和工期均能有效保证.此方案经过多次组 输和整体吊装因素限制,只能采取工厂加工现场拼织专家论证,且实施后效果良好,通过认真总结,形 装.若采用常规的分件高空散装方案,需在现场搭成本施工技术. 设大量的高空脚手架,高空组装,焊接难度大,而且2工程特点与难点 存在较大的质量安全风险.大量脚手架的搭设...