2011年2月 施工技术 第40卷第4期 CONSTRUCTION TECHNOLOCY 67 某国际承包工程汇率风险分析及应对措施 江永建 (中冶集团武汉察研究院有限公司,湖北武汉430080) [摘要]越南某国际承包工程,由于遭受汇率风险,经济损失较大,得出在国际承包工程中,规避汇率风险的重要 性.从项目合问和所处背景,企业自身情况和企业所处外部环境等方面分析了汇率风险发生的原因,及在复杂环 境条件下,企业应该采取的汇率风险应对措施,从而有利地减少或避免汇率浮动给工程带来的损失. [关键词]国际承包工程;汇书风险;应对指施 [中图分类号]TU-920.5;TU-923.48 【文献标识码]A[文章编号]1002-8498(2011)04-0067-02 Analysis of Exchange Rate Risk and Countermeasures for an International Contract Project Jiang Yongjian Wuhan Surveying-geotechnical Research Institute of China Metallurgical Seience and Industry Group Co.Lid.Wuhan Hubei 430080 China) Abstract:Because of the risk of exchange rate the international contract project in Vietnam suffers a great finacial loss so it is important to avoid exchange rate risk in the international contract project.The causes for exchange rate risk are analyzed on the project contract and its background corporation conditions and its external environment.In the plicated circumstances the corporation should make corresponding measures to avoid the exchange rate risk and reduce the loss to a certain degree. Key words:international contract project;exchange rate risk;countermeasure 1工程概况 慢,2008年5月10日,才完成全部工作量的50%, 某工程位于越南人民共和国海防市境内,合同2008年12月9日全部工程完工,2009年1月12日 于2007年6月签订,合同约定主要条款为:①工程进行竣工验收,随后于2009年5月18日完成工程 内容为电厂主厂房施工工程;②承包方式为包工包结算审计,工程结算总价为人民币5280万元. 料,工期6个月,合同总造价为人民币5050万元;③ 工程总收款中,人民币所占部分为25080000 工程款支付比例为:人员、设备进场后10d内支付合元,越南货币所占部分为49286891330越南盾.按 同价10%的备料款,完成全部工作量的50%时,再合同结算汇率,越南货币部分可折算为人民币 支付合同价款的30%,全部工程完工时,支付至合250799...
推荐内容/By 图集吧
- 建设项目在EPC总承包模式下的工程造价控制措施.pdf
- 论国际EPC项目的财务风险管控.pdf
- GB/T 42508-2023 投资项目风险评估指南.pdf
- GB/T 42497-2023 高清版 跨境电子商务进口商品质量风险评估指南.pdf
- T/COSHA 004-2020 危险源辨识、风险评价和控制措施策划指南.pdf
- 中建EPC工程总承包风险管理指引.pdf
- T/CAB CSISA0026-2019 传承法律风险管理指南.pdf
- T/HSPA 0005-2023 文物保护单位安全管理风险评估指南.pdf
- 香港政府工程-设计-施工-总承包管理模式与运营风险.pdf
- 组织措施在国际工程质量风险控制中的地位及作用.pdf
- GB/T 42508-2023 正式版 投资项目风险评估指南.pdf
- 建设工程合同管理风险防范与控制.pdf