施工技术 2010年4月 46 CONSTRUCTION TECHNOLOGY 第39卷第4期 某工程转换层支模体系施工与安全控制 何盛熙 (广厦建设集团安徽创业建设工程有限公司,安微合肥230011) [摘要]通过合肥某工程,分析了转换层高大截面粱结构支模体系的施工技术,系统地述了施工过程中支模体系 的安全措施与控制,指出转换层高大截面梁结构施工过程中安全的重要性和必要性.并对超高、超重满堂支模架 的钢管材质、设计和施工要点,以及针对支模体系在施工中的安全控制,作出了一系列分析与论述,经过设计计算, 选用钢管与扣件等合格的材质,同时在施工中加大管理力度,强化过程控制,达到了预期的施工、质量安全效果. [关键词]转换层;支模体系:设计;施工管理;质量安全指施 [中图分类号]TU755.22 [文献标识码]A [文章编号]1002-8498(2010)04-0046-03 Construction and Safety Control of Some Formwork Support System of Transfer Layer He Shengxi Guangsha Construction Group Anhui Venture Construction Engineering Co.Lad.Hefei Anhui 230011 China) Abstract:Through some engineering in Hefei construction technology for formwork support system of high sectional beam of transfer layer is analyzed and the security measures and control are described systematically which indicate the importance and necessity of safe construction.Furthermore the steel tubular quality design and key points of construction to super-high and overweight formwork support are analyzed and described.By calculation choosing qualified steel tubular and fastener intensifying management effort strengthening control the engineering has gained excellent effect. Key words:transfer layer;formwork support system;design;construction management;security measure for quality 高层结构往往采用高大截面梁来转换楼层平面布构缩进1000mm(见图2),支模体系施工难度较大. 置,给施工安全带来了极大难度.当前,对于超高、超重 的满堂支模体系,由于施工疏于管理,施工方案未经仔 细设计计算,选用钢管与扣件材质不合格、搭设构造不 符合施工规范和设计要求,从而造成整体期墙的重大伤 亡事故.为了确保施工安全,支模体系设计除满足施工 荷载和施工工艺要求外,还必须充分利用建筑物本身的 有利条件,努力适应工期要求,达到安全省料...
推荐内容/By 图集吧
- T/CAS 413-2020 排水管道检测和非开挖修复工程监理规程.pdf
- MT/T 62-1997 煤矿许用电雷管井下可燃气安全度试验方法和判定规则.pdf
- MT/T 191-1989 煤矿井下用橡胶管安全性能检验规范.pdf
- 中建顶管基坑支护施工方案 300页.doc
- SY/T 6186-2020 石油天然气管道安全规范.pdf
- DBJ33/T 1334-2024 建筑施工承插型盘扣式钢管支撑架安全技术规程.pdf
- CB/T 4521-2022 船舶行业企业工业管道和气体橡胶软管安全管理规定.pdf
- DB63/T 2253.7-2024 交通企业(公路)安全生产标准化规范 第7部分:隧道管护.pdf
- DB63/T 2253.6-2024 交通企业(公路)安全生产标准化规范 第6部分:桥梁管护(图文).pdf
- 高大模板支撑体系(盘扣式)安全专项施工方案 285页.doc
- 中建五局《知现场施工管理红线,守工程安全质量底线》课件.pdf
- 中建八局《住宅工程管道井施工工艺标准》.pdf