2011年7月下 施工技术 第40卷第345期 CONSTRUCTION TECHNOLOGY 73 某洲际酒店隔声设计与施工技术 王军强1,黄新2 (1.江苏建筑职业技米学院土木工程学院,江苏徐州221008;2.龙信建设集团有限公司,江苏海门226103) 【摘要]针对某洲际酒店客房的声学设计和施工要求,结合现场样板测试和施工工艺研究,采用组合墙体和浮筑楼 板隔绝噪声和振动的影响,提出墙体和楼板的隔声设计与施工技术措施,有效降低了噪声及振动的影响,声学指标 符合设计要求,满足了客房高标准声品质要求. [关健词]洲际酒店;浮筑楼板;组合墙体;施工;隔声技术 [中图分类号]TU761.12 [文献标识码]A [文章编号]1002-8498(2011)14-0073-03 Sound Insulation Design and Construction Technology of Some Intercontinental Hotel Wang Junqiang' Huang Xin (1.College of Civil Engineering Jiangsu Institute of Arehitectural Technology.Xuthou Jiangsu 221008 China; 2.Longxin Group Haimen Jiangsu 226103 China) Abstract:Based on some intercontinental hotel engineering authors introduce the acoustics design and construction technology of hotel rooms.Combining with the model test and construction technology research posed wall and floating floor are adopted to isolate influence of noise and vibration.Design and construction technology of sound insulation are pointed out to effectively reduced noise and vibration. The acoustics indexes can meet the quality requirements in design for high standard rooms. Key words:intercontinental hotel;floating floor;posed wall;sound insulation technology 1工程概况 人客房的城市噪声;通过内隔墙、楼板卫生间、管道 某洲际酒店为集酒店与办公于一体的45层超传人向邻近客房的噪声;通过客房门传入的走廊 高层建筑,框架剪力墙核心筒结构,总建筑面积 杂声;通风系统传人的风机噪声.为防止来自不同 10.24万m2.其功能按纵向分为3个区,14层为 部位的噪声干扰,必须对这些部位采取控制措施. 裙楼;5~15层为办公部分,16层以上为酒店部分, 噪声控制需要设计、施工、管理、声学检测协调 两部分间及酒店高层大堂下设转换层,在塔楼的第 配合执行,遵循科学的设计标准,并对声学性能进行 16层和第31层各设500m2避难间.酒店和办公对 检测验收,以期达到标准和控制指标要求.该建...
某洲际酒店隔声设计与施工技术.pdf
