某观光廊钢结构吊装技术.pdf

上海,北京钢结构,建筑,建筑工程施工质量验收规范汇编,桁架,起重机,距地,钢桁架,钢结构,预埋件,学术文献
文档页数:3
文档大小:314.87KB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

施工技术 2012年5月上 42 CONSTRUCTION TECHNOLOGY 第41卷第364期 某观光廊钢结构吊装技术 章新 (上海清东工程建设理有限公司,上海201210) [摘要]某观光廊钢结构由2H型钢架及上下弦杆组成,外形尺寸较大.通过对H型钢架观光廊的分析,提 供了工厂加工构件,现场拼装后分片吊装,再高空散装桁架间的连杆的施工技术,重点间述了双机拾吊技术,最大 程度地减少高空作业,降低成本,缩短工期,保障施工安全. [关键词]钢结构:H型钢桁架;吊装;双机抬吊;加工 [中图分类号]TU758.11 [文献标识码]A 文章编号]1002-8498(2012)09-0042-03 Steel Structure Hoisting Technology for Some Sightseeing Gallery Zhang Xin (Shanghai Pudong Engineering Construction Management Ltd.Shanghai 201210.China) Abstract:Some sightseeing gallery poses of two H-profiled-steel trusses and their connection rods. The steel trusses are very big.Through analysis of H-profiled-steel trusses'characteristics the author puts forward construction technology of making member in factory assembling on site and hoisting piece by piece and then installing connection rods in high-sky.The technology furthest reduces high-sky working lows cost shortens construction period and guarantees construction safety.The author mainly. shows hoisting technology by double cranes. Key words:steel structures:H-profiled-steel truss;hoisting:hoisting by double cranes;prefabrication 1工程概况 桥的2福桁架先在地面安装位置附近整体拼装好, 本观光天桥钢结构由2H型钢桁架及其上然后采用双机抬吊分别将其吊至安装位置,2福桁 下弦连杆组成,屋面系统为形擦条及单层彩钢 架就位后,在桁架下方搭设满堂脚手架操作平台, 板,设有内天沟.屋顶设有由角钢构成的角桁架 再在高空散装桁架间的连杆,最后安装屋面系统等. (装饰性构架).在钢结构下弦设有压型钢板及混3施工方法 凝土楼承板.H型钢桁架下弦两端通过球形支座与 本工程钢结构安装支座高度为18.950m 将钢 混凝土牛腿上的预埋件焊接连接,钢桁架上弦两端 桥架廊道的2福桁架先在地面安装位置附近整体拼 与混凝土柱上的预埋件采用高强螺栓连接.混凝 装好,然后采用双机抬吊分别将其吊至安装位置, 土牛腿标高为18.700m.钢结构桁架廊道长 先吊远离起重机站位处1福,后吊离起重机站位处 43.4m 高6.3m 其中钢桁架高为4.4...

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)