施工技术 2014年11月上 10 CONSTRUCTION TECHNOLOGY 第43卷第21期 D0I:10.7672/5j52014210010 某风洞消声室结构施工关键技术 李博平,张笈玮,杨辉 (中国人民解放军63926部队,北京100192) [摘要]针对某风洞消声室结构施工中,结构剪力墙较高,墙体垂直度要求高及结构施工前室内大型设备已安装, 无法从地面搭设满堂脚手架作为梁板模板支撑等施工难题,提出了高大剪力墙施工精度控制技术和现浇梁板无地 面支撑可测可控支撑体系施工技术,通过该技术顺利解决了施工难题. [关键词]风洞:混凝土;支撑:剪力墙;精度:施工技术 [中图分类号]TU745.4 [文献标识码]A [文章编号]1002-8498(2014)21-0010-03 Structural Construction Technology of Muffler Room of a Wind Tunnel Li Boping Zhang Jiwei Yang Hui The 63926 Troop of Chinese People's Liberation Army Beijing 100192 China) Abstract:During the construction of the muffler room of a wind tunnel the standard of the squareness for the high shear walls is strict.Full scaffold framing can't be applied to support the mould boards for the beams and plates because of the large-seale equipment installed before the construction.Based on above problems the technologies of the accuracy controlling for the high shear walls and the determinable and controllable framing for the mould boards for the beams and plates were proposed.And the problems are solved. Key words:wind tunnels;concrete;supports;shear walls;accuracy;construction 1工程概况 消声室是某风洞工程的重要组成部分,结构形 式为地上单层钢筋混凝土剪力墙结构(见图1a) 平 面尺寸为30.3m×12.3m 层高23.3m 由于室内无 隔墙,单面剪力墙长30.3m、高23.3m 要求垂直度 偏差≤10mm 剪力墙施工精度控制难度较大.此 外,由于安装工艺的要求,在消声室结构施工前,室 内设备已安装就位(见图1b) 设备直径8.5m 长 a消声室结构施工现场 26.8m 中心标高5.800m 占用了消声室结构内的 场地空间,设备两侧距离剪力墙不足2m(见图1c) 无法从地面搭设满堂脚手架,现浇钢筋混凝土屋面 梁板施工成为难点. 针对以上施工难题,研究提出了大尺寸混凝土 剪力墙施工精度综合控制技术和现浇混凝土梁板 无地面支撑可测可控模板支撑体系. b结构施工前室内 2现浇梁板无地面支撑模板支撑体系 c消声室内部示意 设备...
推荐内容/By 图集吧
- 吊索吊具安全规程培训课件.ppt
- SH/T 3006-2024 石油化工控制室设计规范.pdf
- 完整版 T/CECS 1369-2023 置换砂浆加固砌体结构技术规程.pdf
- 完整版 T/CECS 1339-2023 大跨度钢结构监测技术规程.pdf
- DB64-665-2015 EPS模块外保温工程技术规程.pdf
- T/CCIAT 0057-2023 大直径盾构下穿既有水域施工技术规程.pdf
- T/CCIAT 0030-2020 水工隧洞TBM施工技术规程.pdf
- T/CBMF 128-2021 超高性能混凝土现场浇筑施工技术规程.pdf
- 完整版 T/CECS 616-2019 隧道施工超前地质预报技术规程.pdf
- KA/T 3-2023 井工煤矿生产时期排水技术规范.pdf
- KA/T 2-2023 煤层底板石灰岩含水层超前区域治理技术规范.pdf
- LS/T 1229-2022 粮堆坍塌事故防范技术规程.pdf