2015年8月上 施工技术 第44卷第15期 CONSTRUCTION TECHNOLOGY 35 D0I:10.7672/8js2015150035 洛阳博物馆新馆大跨度框架梁预应力损失测试研究 李岐山,张伟,赵玉军 (河南国安建设集团有限公司,河南洛阳471000) [摘要]洛阳博物馆新馆工程大跨度预应力框架梁采用后张有黏结预应力施工工艺,施工过程中应加强其预应力 施工控制,特别是张拉过程中的预应力损失监控及测试十分重要.通过精确计算出摩阻损失系数,测定出特征截 面的应力和应变值,并与理论设计验算值进行对比分析,可达到精确控制预应力施工质量的目的. [关键词]预应力;框架梁;后张法;施工质量控制;预应力损失 [中图分类号]TU378 [文献标识码]A[文章编号]1002-8498(2015)15-0035-04 Prestressing Loss Test of the Large Span Frame Beam of Luoyang New Museum Li Qishan Zhang Wei Zhao Yujun (He'nan Guoan Construction Group Co.Lid.Luoyang He'nan 471000 China) Abstract:In Luoyang New Museum the prestressing loss monitoring and testing play very important role in the process of tensioning especially for the prestressed control of the construction sequence of a large span prestressed frame beam adopting the post-tensioned prestressed technology.The measured values of stress and strain of the beam characteristic cross section are pared with the theoretical design calculation ones based on the coefficient of friction loss aceurately obtained in this paper.Finally it can achieve the purpose of precise control of the prestressing construction quality. Key words:prestressing;frame beam;post-tensioning method;quality control;prestressing loss 1工程概况 力状态十分重要,而且也是一个预应力结构施工控 洛阳博物馆新馆工程为特大型地市级博物馆,制中的一个难点. 设计使用年限为一级100年.总建筑面积 已有研究表明,超长结构混凝土梁采用无黏结 43654m2 由展览馆、辅楼、下沉广场、跌落水池、观 预应力温度筋及设置部分预应力配筋形式对解决 光塔组成.其中展览馆2层,长141m 宽143.4m 超长结构梁板温度应力裂缝、对提高预应力框架结 檐口高22m 为超长框架结构梁板.为解决超长结 构延性及其抗震性能都特别有效[.预应力框架 构的温度应力问题,展览馆首层和2层楼板均采用 梁张拉...
洛阳博物馆新馆大跨度框架梁预应力损失测试研究.pdf