2012年8月上 施工技术 第41卷第370期 CONSTRUCTION TECHNOLOGY 55 深圳机场能源中心水蓄冷布水系统安装技术 谢上冬,黄远强,陈立群 (中建工业设备安装有限公司,江苏南京210046) [摘要]深圳机场能源中心水蓄冷系统,蓄冷水罐设计有效总容积为55200m3 由4个13800m3的水罐组成.蓄冷 水罐性能指数要求高,如何选择布水方式、布水器的形式及布水系统的计算是本工程的难点.经过技术攻关,成功 解决了上述难题,获得了良好的经济效益.主要介绍蓄冷水罐水蓄冷布水系统的安装技术. [关键词]机场;能源中心;蓄冷水罐;布水系统;安装 [中图分类号]TU758.7 [文献标识码]A [文章编号]1002-8498(2012)15-0055-03 Installation Technique of Chilled Water Storage Distribution System in Shenzhen Airport Energy Center Xie Shangdong Huang Yuanqiang Chen Liqun China Construction Industrial Equipment Installation Co.Ltd.Nanjing Jiangsu 210046 China) Abstract:The Energy Center of Shenzhen Airport was designed to have an effective chilled water volume of 55 200m2 which was constituted of four water tanks of 13 800m.These chilled water storage tanks were subjected to high performance request.Technical difficulties included the selection of water distributor design of the distribution system and system calculations.These difficult problems were solved by concentrated study and good economic benefit was gained.This paper gives an introduction to the installation technique of the chilled water distribution system in Shenzhen Airport Energy Center. Key words:airports;energy center;chilled water storage tank;influent distribution system;installation 1工程概况 匀布置,水流分配口水流进口雷诺数Re=240~ 深圳机场能源中心冷源供冷形式采用电制冷850,流速均匀并<0.03m/s. 水蓄冷方式.水蓄冷系统中,蓄冷水罐设计有效 3)布水系统的水流分配口形式和数量通过计 总容积为55200m3 由4个13800m3的水罐组成. 算确定,但必须确保达到上述技术要求,最终效果 布水系统的设计就是通过精确的计算和布置,控制 确保达到单个水罐蓄冷量12.7万kWh的要求. 水流平稳地进入或引出...
深圳机场能源中心水蓄冷布水系统安装技术.pdf