深基坑施工新技术在某污水处理厂配套管网工程中的应用.pdf

学术文献
文档页数:6
文档大小:2.52MB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

2017年3月上 施工技术 第46卷第5期 CONSTRUCTION TECHNOLOGY 35 DOI:10. 7672/sgjs2017050035 深基坑施工新技术在某污水处理厂配套管网 工程中的应用* 郭自灿 (湖北职业技术学院建筑技术学院,湖北孝感432000) [摘要】某污水处理厂配套管网工程包括污水管道及中水管道工程,共设置16个顶管深基坑并划分为3种类型。

基坑土方开挖分4种工况进行分步开挖,保证了开挖的效率和安全。

对顶管进出洞口破除的灌注桩采取加固处 理,再设置橡胶止水法兰及止水构造,保证了围护结构的整体稳定性。

基坑开挖时坑内设置疏干井,封底后至少保 留1口疏于井并与坑内排水盲沟连接,构成了坑内排水系统,提高了基坑降水的效率。

分别设置桩体深层水平位 移观测点,桩顶水平位移、竖向位移观测点、地下水位观测点等监测点位,并定期观察是否超过报警值,避免了基坑 围护结构失稳。

[关键词】深基坑;顶管;土方开挖;监测;围护结构;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2017)05-0035-06 NewConstructionTechnologyApplicationofDeepFoundation ExcavationinAccessoryPipeNetProjectof aSewage TreatmentPlant Guo Zican (SchoolfArchiture,HubeiPolyechnicInstite,Xaogan,Hubei432000,China) Abstract:The accessory pipe net project of a sewage treatment plant includes sewage pipeline engineering and reclaimed water pipeline engineering, it arranges sixteen deep foundation excavation of pipe jacking and divides into three types. There are four operating conditions for pit excavation, ensuring the excavation eficieney and safety. The destroyed cast-in-place piles which are situated in pipe jacking passageway take the reinforcement and increase by rubber water stop flange and water stop structure, ensuring the global stability of exterior-protected structure.When foundation excavation is excavated, dewatering wells are arranged in foundation excavation. It should retain one dewatering well at least after back cover and links with drainage blind ditch, constituting the drainage system of inside pit and improving the pit dewatering efficiency. It sets up many monitoring sites including the horizontal displacement observation point of deep pile body,horizontal displacement of pile top,vertical displacement observation point,underground water level observation point and so on. Moreover, the operatorsobserve hemonitoring sites alamsbeyondornotatregular intervalsavoiding theinstabilityf exterior-protected structure. Key words: deep foundation excavation; pipe jacking; earth excavation; monitor...

资源链接请先登录(扫码可直接登录、免注册)
①本文档内容版权归属内容提供方。如果您对本资料有版权申诉,请及时联系我方进行处理(联系方式详见页脚)。
②由于网络或浏览器兼容性等问题导致下载失败,请加客服微信处理(详见下载弹窗提示),感谢理解。
③本资料由其他用户上传,本站不保证质量、数量等令人满意,若存在资料虚假不完整,请及时联系客服投诉处理。

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)