施工技术 2013年4月下 76 CONSTRUCTION TECHNOLOGY 第42卷第8期 D0I:10.7672/sgjs2013080076 温州中银大厦原桩再利用技术 裘国荣,孙永明,余永志 (浙江宝业建设集团有限公司,浙江绍兴312028) [摘要]温州尚品国际大厦为12层钢框架结构,建在已拆除的温州中银大厦原址上.原温州中银大厦共计130根 的基础桩仍然保留,通过静载荷试验、混凝土强度试验、低应变试验等检测手段鉴定其可有效利用桩基74根,保证 原桩能够满足承载力与沉降控制的规范和设计要求以及新建筑物的安全使用要求,节约了资源和工期,降低了工 程造价,控制了污染物的排放. [关键词]桩基础;再利用;静载试验;取芯;承载力 [中图分类号]TU753.3 [文献标识码]A [文章编号]1002-8498(2013)08-0076-03 Technology for Recycling the Old Piles of Wenzhou Zhongyin Building Qiu Guorong Sun Yongming Yu Yongzhi (Zhejiang Baoye Construction Group Co.Ltd.Shaoxing Zhejiang 312028 China) Abstract:Wenzhou Shangpin International Building is a twelve-storey steel framed structure.It was constructed on the site of demolished Wenzhou Zhongyin Building.The 130 piles of Wenzhou Zhongyin Building were decided to stay among them 74 piles were found to be reusable with static load test concrete intensity test and low stain test etc.It was shown that these piles could satisfy the loading bearing capacity and settlement control requirement as well as other safety service requirement of the new building.Recycling of the 74 piles helped to save resources shorten construction time reduce the cost and control the emission of pollutants. Key words:piles;recycling;static load test;coring;bearing capacity 1工程概况 共76根(原A型桩18根、原B型桩58根). 温州尚品国际大厦位于温州市车站大道与学2检测项目 院路交汇处西侧,上部结构为12层钢框架结构,设 为确定上述76根桩是否可以满足新建筑物的 1层地下室,采用桩筏基础,基础埋深约6.0m 建在安全使用要求,建设单位委托国家建筑工程质量监 已拆除的温州中银大厦原址上. 督检验中心和温州市岩土工程有限公司对该76根 原温州中银大厦于2004年5月采用爆破拆除 桩进行检测鉴定. 至±0.000标高后,在清理...
温州中银大厦原桩再利用技术.pdf