2016年9月下 施工技术 第45卷第18期 CONSTRUCTION TECHNOLOGY 111 D0I:10.7672/8js2016180111 空心薄壁墩辊模法施工工艺改进方法 李文,袁立明 (中交一公局第三工程有限公司,北京101120) [摘委]样细介绍了空心满壁徽银模法的施工工艺,根据理论与实践相结合的方法找出该工艺的优缺点,进而得出 模法施工工艺的提高及破进方法,以使该施工工艺在令后的薄壁施工中能更好地发晖作用. [关键词]桥梁工程;空心薄壁;模;施工工艺 [中图分类号]U445.559[支献标识码]A[支章编号]1002-8498(2016)18-0111-04 Construction Improving Method of Roller Dies for Hollow Pier with Thin Wall Li Wen Yuan Liming (The Third Engineering Co.Lad.of the First Highway Engineering Bureau of CCCC Beijing 101120 China) Abstract:The construction process of roller dies for hollow pier with thin wall is described in detail.The advantages and disadvantages of this process are put forward with bination of theoretical and actual method so the improving method and process of roller dies are obtained.It will has an effective role of this construction process for hollow pier with thin wall. Key words:bridges;hollow pier with thin wall;roller dies;construction 1工程概况 荣鸟高速LJSG-19标雁宿崖大桥位于涞源县雁 宿崖村西北,桥梁设针中心雄导为K92989.5 交 角90°,起点桩号:K92798.0 终点.桩号:K93 331 全桥总长533m 本桥上部结构共分4联,跨径 布置为(2×30)m(6812068)m(3×30)m 图1厘宿座大桥 (4×30)m 第1 3 4联为引桥,第1联为30m标准 Fig.I Yansuya Bridge 跨径先简支后桥面连续T梁,第3 4联为30m标准 跨经先简支后结构连续T梁;第2联为主桥,采用 (6812068)m预应力湿凝土连续刚构;下部结 构桥墩采用空心壁墩和双柱,桥台采用重力式 U台,好大基础.本桥3 4 5 6 7号为空心薄壁 缴,雁瘩崖大桥效果图1所示. 2空心薄壁徽横施工工艺原理 图2钢结构系统示意 2.1首动液压棋系统的组成 Fig.2 Steel structure system 动液压棋系统主要由4大系统组成:钢结 构系统、自动液压提升系统、电气控制系统和安全、 2)自动液压系统自动液压系统由1台 防护系统. 7.5kW液压泵提供动力,设定作压力为20MPa 1)钢结构系统由上护栏、模板架平台、下操作 通过电磁溢流阀旋纽可以调整压力大小.本系统 平台3部分组成,如图2所示. 通过液压...
推荐内容/By 图集吧
- 017 增强水泥(GRC)空心条板隔墙施工工艺.doc
- 旋挖钻机成孔开放式后注浆灌注桩施工工艺.pdf
- 地下连续墙入岩成槽施工工艺改进.pdf
- 超厚大跨度XPS块体内模现浇空心楼盖施工技术.pdf
- 薄壁箱形加肋结构制作与组对工艺.pdf
- 某预应力空心板梁模板改进工艺.pdf
- BDF薄壁箱体薄壁盒成孔现浇空心楼盖施工方案(14页、word版、可编辑)
- 空心薄壁墩辊模法施工工艺改进方法
- 风荷载作用下薄壁空心墩翻模施工安全控制.pdf
- 高清可打印 14ST201-2地铁工程机电设备系统重点施工工艺-给排水通风与空调系统.pdf
- 薄壁方箱现浇混凝土空心楼盖施工技术.pdf
- 现浇混凝土厚大空心无梁楼盖施工工法.pdf