施工技术 2013年3月上 44 CONSTRUCTION TECHNOLOGY 第42卷第5期 D0I:10.7672/8gs2013050044 锦屏高陡边坡脚手架安全管理控制技术 曾思凯,王勇,陈鹏飞 (中国永利水电第七工程局成都水电建设工程有限公司,四川成都611130) [摘要]高陡边坡、高危危岩体处理支护工程中脚手架是边坡支护施工的重要环节,脚手架搭设质量及施工安全管 理直接影响脚手架的安全运行,进而影响工程施工的安全、进度和成本.锦屏一级水电站高陡边坡脚手架在搭设 施工中的安全管理控制程序及专利加固技术的应用,为脚手架搭设及施工安全管理控制提供了有效手段,保证了 脚手架搭设施工过程的安全受控. [关键调]脚手架;水电站;高陡边坡;安全管理 [中图分类号]TU714 [文献标识码]A [文章编号]1002-8498(2013)05-0044-04 Safety Management and Control for Scaffolds on High and Steep Slopes in Jinping Zeng Sikai Wang Yong Chen Pengfei Chengdu Sinohydro Construction Engineering Co.Led.Sinohydro Bureau 7 Co.Lad.Chengdu Sichuan 611130 China) Abstract:Scaffolds are very important in support construction for high and steep slopes and dangerous rock bodies.The installation quality and construction safety management have direct influences on the safe operation and as a result influence the construction safety construction progress and cost. Application of construction safety management control procedure and patented strengthening technology in the scaffold installation for the high and steep slopes of Jinping first stage hydropower station provided effective measures for the safe construction and safety management of scaffolds and ensured the construction safety during scaffold installation. Key words:scaffolds;hydropower stations;high and steep slopes;safety management 1工程概况 2脚手架工程安全管理控制程序 锦屏一级水电站位于四川省凉山彝族自治州 为保证锦屏水电站脚手架工程实施过程安全 木里县和盐源县交界处的雅砻江大河湾干流河段,受控,制定了一套较为完善的管理程序,如图1 本工程中的双曲拱坝高305m 为当今世界第一高拱所示. 坝,电站装机6台,单机容量600MW.大坝左岸...