施工技术 2012年6月下 78 CONSTRUCTION TECHNOLOCY 第41卷第367期 高海拔地区机械化组塔施工技术 韩慧,徐聚科 (武警水电第二总队八支队,福厦门361009) [摘要]格尔木至拉萨±400kV直流联网输电路工程是西藏电网与西北电网唯一的联络通道,施工环境复杂劣, 工作量大,工期紧,组塔安全作业难以保证.结合工程实际,通过施工方案优化,确定选用机械化组塔施工技术,介 绍组塔的施工工艺及控制措施.结果表明,机械化组塔技术在高海拔地区的应用能确保工程质量和工期要求. 【关键词]高海拔地区;电路工程:组塔:机械化:施工技术 [中图分类号]TU994;TM754 【文献标识码]A[文章编号]1002-8498(2012)12-0078-03 Mechanization Pylon Erection Technology at High Altitude Area Han Hui.Xu Juke (No.8 Detachment No.2 Hydropower Feree of Armed Police Xiamen Fajian 361009 China) Abstract:Geermu to Lhasa±400 kV HVDC power transmission project is the only cross-passage to Tibet power grid and northwest power grid and it has the characteristics of plex construction environment heavy workload and tight schedule the pylon erection safety is difficult to ensure.Combined with the construction conditions the mechanization pylon erection technology is adopted by scheme selection and the construction process and control treatments of pylon erection is introduced in detail.The results show that the application of mechanization pylon erection technology ensures the construction quality and construction time requirement. Key words:high altitude area;transmission project;pylon;mechanization;construction 1工程概况 机吊装组塔、流水向前作业的新型组塔方式,减少 格尔木一拉萨±400kV直流联网输电线路工程了抱杆的使用,按照工期要求完成了高海拔地区恶 是西藏电网与西北电网唯一的联络通道,8标段线劣条件下137基大开挖基础的组塔施工任务. 路全长102.715km 路径沿线海拔范围在4480~2优化前施工方案 5300m.沿线地形以山地为主,平地主要为草原和 优化前预备采用内悬浮外拉线抱杆分解组塔, 泥沼.其中普土40%、坚土10%、松砂石25%、泥其施工工艺简单、成熟,所用工器具较为轻便、安装 水10%、岩石15%.本标段的施工环境非常恶劣,...