施工技术 2014年1月下 38 CONSTRUCTION TECHNOLOGY 第43卷第2期 D0I:10.7672/sgjs2014020038 高空钢结构连廊整体提升关键施工技术 高雷雷 (中冶天工上海十三冶建设有限公司,上海201900) [摘要]结合超高层建筑钢结构连廊工程实例,对提升系统有限元分析、提升单元测量控制、高空调整就位等关键 技术进行了研究.相关结果表明,提升系统设计可靠,组合荷载下应力及变形均在允许值范围内;测量工艺及高空 就位方式选择合理确保了提升的顺利实施;针对提升过程的风险制定应急预案,有效保证了施工的安全性. [关键词]钢结构;连廊;提升;监测;施工技术 [中图分类号]TU758.1 [文献标识码]A[文章编号]1002-8498(2014)02-0038-04 The Key Construction of Integral Lifting for Steel Corridor at High Altitude Gao Leilei (CMTCC Shanghai Shisanye Construciton Co.Ltd. Shanghai 201900 China) Abstract:Combined with the practical engineering of steel corridor of tall buildings the finite element analysis for lifting system measurement and control for lifting unit adjustment location at high altitude are studied.The study results show that the design of the lifting system is reliable stress and deformation is under the allowable range of values measurement technology and the way to lift ensure the smooth implementation of improved construction.Contingency plans were developed in response the risk of the development process which effectively guaranteed the safety of the construction. Key words:steel structures;corridor;lifting;monitoring;construction 1工程概况 上海金虹桥国际中心工程总占地面积 35494m2 位于虹桥功能拓展区的中心地带,是上海 商务商贸副中心.该工程主体结构由南塔楼、北塔 楼及连廊3部分组成,形成“凯旋门”式结构.办公 塔楼地上29层,总结构高度143.7m 总建筑面积 20 146233m2(见图1).塔楼结构采用框架-核心筒型 a平面 钢混凝土组合结构体系,核心简为主要抗侧力结构 体系,剪力墙布置有独立箱形柱. 塔楼22~29层为连体层,高度为100.9~ 134.6m 形成高空钢结构连廊.连廊平面位于~ 轴/8~2轴,尺寸为42m×24.7m 中间无竖向 结构,为多层片状连体结构形式.连廊平面形式基 本一致,均采用H型钢梁及钢筋桁架楼承板组合结 构,钢连廊...
推荐内容/By 规范库
-
新型电力系统的弹性提升关键关键技术.pdf
-
开关、母线设备运行培训手册.pdf
-
基层员工培训教材 配电线路运行与检修.pdf
-
基层员工培训教材 仪表与测量.pdf
-
2025年中天集团交付品质提升重点管控作业指导手册(地库工程)110页 .pdf
-
2025CPXY-J510 既有建筑加装电梯设计与安装一全螺栓连接H型钢结构及金属板外围护.pdf
-
广东省城镇住宅品质提升设计图册(2025).pdf
-
桥梁施工安全知识培训ppt课件.pptx
-
T/CEMA 037-2025 耳穴疗法规范化培训基地建设指南.pdf
-
普陀海洋科技产业孵化基地三期及园区提升改造项目(幕墙工程) C 1170页.pdf
-
瑞安市解放路提升改造工程技术标 495页.docx
-
技术标 婺城区长湖湾片区雨水管网提升工程总承包EPC(不含设计部分) 298页.pdf