施工技术 2014年1月下 38 CONSTRUCTION TECHNOLOGY 第43卷第2期 D0I:10.7672/sgjs2014020038 高空钢结构连廊整体提升关键施工技术 高雷雷 (中冶天工上海十三冶建设有限公司,上海201900) [摘要]结合超高层建筑钢结构连廊工程实例,对提升系统有限元分析、提升单元测量控制、高空调整就位等关键 技术进行了研究.相关结果表明,提升系统设计可靠,组合荷载下应力及变形均在允许值范围内;测量工艺及高空 就位方式选择合理确保了提升的顺利实施;针对提升过程的风险制定应急预案,有效保证了施工的安全性. [关键词]钢结构;连廊;提升;监测;施工技术 [中图分类号]TU758.1 [文献标识码]A[文章编号]1002-8498(2014)02-0038-04 The Key Construction of Integral Lifting for Steel Corridor at High Altitude Gao Leilei (CMTCC Shanghai Shisanye Construciton Co.Ltd. Shanghai 201900 China) Abstract:Combined with the practical engineering of steel corridor of tall buildings the finite element analysis for lifting system measurement and control for lifting unit adjustment location at high altitude are studied.The study results show that the design of the lifting system is reliable stress and deformation is under the allowable range of values measurement technology and the way to lift ensure the smooth implementation of improved construction.Contingency plans were developed in response the risk of the development process which effectively guaranteed the safety of the construction. Key words:steel structures;corridor;lifting;monitoring;construction 1工程概况 上海金虹桥国际中心工程总占地面积 35494m2 位于虹桥功能拓展区的中心地带,是上海 商务商贸副中心.该工程主体结构由南塔楼、北塔 楼及连廊3部分组成,形成“凯旋门”式结构.办公 塔楼地上29层,总结构高度143.7m 总建筑面积 20 146233m2(见图1).塔楼结构采用框架-核心筒型 a平面 钢混凝土组合结构体系,核心简为主要抗侧力结构 体系,剪力墙布置有独立箱形柱. 塔楼22~29层为连体层,高度为100.9~ 134.6m 形成高空钢结构连廊.连廊平面位于~ 轴/8~2轴,尺寸为42m×24.7m 中间无竖向 结构,为多层片状连体结构形式.连廊平面形式基 本一致,均采用H型钢梁及钢筋桁架楼承板组合结 构,钢连廊...
推荐内容/By 图集吧
- 公路交通安全设施精细化提升关键技术指南2023.pdf
- 中建四局《EPC总承包管理能力提升探索与实施》.pdf
- 某项目会议中心钢结构工程钢桁架吊装(提升)专项施工方案.pdf
- 钢结构工程 北京建工培训中心编著 13016824.pdf
- 钢结构工程施工质量验收规范培训讲座 GB 50205-2001 侯兆欣等主编 11093089.pdf
- 整套变压器培训课件(精华版).pdf
- 钢结构连廊专项施工方案2022年word120页.docx
- 工程建设质量提升暨QC小组活动经验交流会 成果选编(2022年).pdf
- 钢结构工程专题培训与学习交流 2023年 210页.pptx
- 2024年钢结构专业知识、优化设计培训ppt120页.pptx
- 中建主干路提升改造施工组织设计 255页.docx
- DB43/T 3066-2024 既有桥梁防船撞性能评估与提升设计标准.pdf