施工技术 2015年6月上 26 CONSTRUCTION TECHNOLOGY 第44卷第11期 D0:10.7672/sgjs2015110026 钢结构连廊安装施工方法及力学分析 孙连波 (中铁建设集团有限公司,北京100040) [摘要]某研发中心实验楼,由于现场条件限制,不能搭设脚手架,导致主钢梁不能在空中拼接,与此同时,主梁在 地面拼接后的自重超出现场塔式起重机承载范围,现场又没有大型吊车站位位置,基于以上原因,给出了使用人工 手拉葫芦方法进行吊装的方法和步骤,并对吊装支架和主钢梁在自身重力作用下的受力性能进行了分析. [关键词]钢结构;钢连廊;安装;力学分析 [中图分类号]TU758.11 [文献标识码]A [文章编号]1002-8498(2015)11-0026-03 Installation Method and Mechanical Analysis of Steel Gallery Sun Lianbo China Railsway Construction Group Co.Lid.Beijing 100040 China) Abstract:Scaffold can not be set up because of field condition limits for some experiment building of research and development center thus main steel beam can not spliced.Meanwhile the dead weight of main beam exceeds the bearing range of tower crane on the spot there is no position of large crane.Based on the above reasons this paper introduces hoisting method and steps of manual hand chain hoist analyzes the mechanical behavior of hoisting stent and main steel beam under dead weight effect. Key words:steel structures;steel gallery;installation;mechanical analysis 1工程概况 本工程为某研发中心实验楼连廊,此研发中心 实验楼与拓展楼(4层、6层、8层之间)安装钢结构 连廊,建成后可以实现两楼4层、6层、8层之间相互 连通.本连廊主体采用钢结构,每连廊由2根主钢 梁、12根次钢梁组成,楼板为闭口镀锌组合楼板,外 图1连廊钢结构轴测图 立面为钢化玻璃栏板.连廊净跨为17.4m 宽为 Fig.1 Axonometric drawing of steel joint gallery 3.5m.连廊通过2根主钢梁与两楼之间混凝土牛 为H900×400x20×25(局部变截面),每根重5.7t 腿铰接滑动连接,钢梁与混凝土牛腿之间垫有 次梁截面为H400×250×10x14 每根重1.2t.主梁 60mm厚橡胶垫块. 每根分3段加工运至现场(分段长度根据设计要 本文主要讨论此种单层钢连廊根据现场条件 求、现场塔式起重机负荷及相关设计规范).现场 采用的较可靠可行的安装方法.连廊钢结构轴测 塔式起重机此位置最大吊重为1.3t 由于连廊位于 图如图1...
推荐内容/By 图集吧
- 中建基地项目工程 钢结构安装施工方案 2024年编制.doc
- 物流中心钢结构安装安全专项施工方案.pdf
- 火力发电建设中钢结构和钢筋混凝土结构的代用 水利电力部电力建设总局编 11138712.pdf
- 建筑钢结构施工力学原理 罗永峰 12181730.pdf
- 看施工图学预算之钢结构工程 筑匠著 14624312.pdf
- 轻型钢结构工程制作安装要点与质量验收图表对照手册 第4册 手册编委会编 12817921.pdf
- 实用钢结构工程安装技术手册 王景文主编 11712561.pdf
- 轻型钢结构制作安装便携手册 本书编委会编著 12083653.pdf
- 水工钢结构 武汉水利电力学院等编 10977612.pdf
- 水工钢结构 武汉水利电力学院等编 10257529.pdf
- 水工钢结构 武汉水利电力大学等编 11678211.pdf
- 水工钢结构 第3版 武汉水利电力大学等编 12397953.pdf