施工技术 2016年12月上 142 CONSTRUCTION TECHNOLOGY 第45卷第23期 D0I:10.7672/sjs2016230142 高温气冷堆抗倾覆锚索施工技术 董林博,刘霖 (中国核电工程有限公司福清核电项目部,福建福清350318) [摘要]错索指的是将拉力传递到稳定的岩层或土体的错固体系.它通常由钢绞线或高强钢丝束(做杆体材料)、 注浆体、锚具、套管和可能使用的连接器组成.根据设计要求,反应堆厂房侧楼底板为抗倾覆锚索施工,对锚索施 工的施工工艺、施工重难点、质量控制进行了详细介绍. [关键词]核电站;高温气冷堆;抗倾覆错索;质量控制;施工技术 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2016)23-0142-05 Construction Technology of Anti-overturning Anchor Cable for High Temperature Gas-cooled Reactor Dong Linbo Liu Lin Fuging Nuclear Pocer Project Department of China Nuclear Power Engineering Co.Lad.Fuging Fujian 350318 China) Abstract:Anchor cable which transfers tension to the stable rock layer or soil is anchorage system.It consists of steel strand or high strength steel wire bundle material)rod body grouting body anchorage casing and the possible use of connectors.According to the design requirements the base plate of the side building of reactor plant is constructed by anchor cable.In this paper the construction technology of anchor cable construction difficulties quality control are introduced in detail. Key words:nuclear power stations;high temperature gas-cooled reactor;anti-overturning anchor cable; quality control;construction 0引言 倾覆锚索静止工作状态总抗力44000kN;每根错索 华能山东石岛湾核电厂高温气冷堆核电站示设计工作状态抗力524kN 最大极限抗力1048kN. 范工程地处山东威海市,高温堆核岛主厂房分为反 抗倾覆错索安全系数设计2.0,锚索防腐等级要求 应堆厂房(包括侧楼)、乏燃料厂房、核辅助厂房以 I级,设计寿命>50年. 及电气厂房.因反应堆厂房与侧楼的基础底标高 常规岛厂房 及主体的结构形式不同,防止侧楼在地震过程中发 1/1-2 1/1-4 1/1-6 /1-7 C/1-10 33800 生倾覆,侧楼基础底板设置了84根抗倾覆错索.本 120012400 400 28002400 190d700540054...
推荐内容/By 图集吧
- 中建 天津117塔楼核心筒内竖向泵管移位专项施工方案.pdf
- 遂宁市河东新区绿色新城(A区)项目(东平北路管廊(B标段))综合管廊深基坑专项施工方案.pdf
- SY/T 4216.2-2017 石油天然气建设工程施工质量验收规范 油气输送管道穿越工程 第2部分:钻爆隧道穿越.pdf
- SY/T 4203-2019 石油天然气建设工程施工质量验收规范 站内工艺管道工程.pdf
- 碧桂园 机电施工标准手册(地下室管网篇).pdf
- 非金属风管制作及安装工艺.doc
- 004 风管及部件安装工艺.doc
- 03室内采暖管道安装工程.doc
- 09 制冷管道保温质量管理.doc
- 012 制冷管道保温工艺.doc
- 008 管内穿绝缘导线安装工艺.doc
- JT/T 1516-2024 公路工程脚手架与支架施工安全技术规程.pdf