加固后楼板的力学性能分析与现场试验研究.pdf

建筑加固,学术文献
文档页数:6
文档大小:878.45KB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

施工技术 2012年11月下 62 CONSTRUCTION TECHNOLOGY 第41卷第377期 加固后楼板的力学性能分析与现场试验研究 陈赞,易乐平,顾天熊,王国佐 (苏州二建建筑集团有限公司,江苏苏州215131) [摘要]以有限元理论为基础,利用ANSYS软件,建立某楼板的数值模型,通过施加均布荷载,分析经过加固后的 楼板的物理力学状态,并和现场实测结果进行对比,分析相关指标的计算值和实测值的偏离程度,为“工程加固工 程检测”提供新思路. [关键词]加固;楼板;有限元分析;检测 [中图分类号]TU755 [文献标识码]A [文章编号]1002-8498(2012)22-0062-06 Mechanical Properties Analysis and Test Research on the Strengthened Floors Chen Yun Yi Leping Gu Tianxiong Wang Guozuo Sushou Erjian Construction Group Co.Ld.Suzhou Jiangsu 215131 China) Abstract:Based on the theory of finite element method the numerical model for a building floor was established using the software ANSYS.The physical and mechanical properties of the strengthened floor were analyzed by applying uniform load on the model.The simulation results were pared to site measurements and the deviations of some parameters were analyzed.This research provides a new idea for engineering strengthening and engineering inspection. Key words:strengthening;floors;finite element analysis;detecting 1工程概况 2施工特点 苏州市吴中区资产经营管理有限公司天鸿大 1)工期紧,任务重,气温低.本工程施工工期 厦位于吴中区塔韵路和吴山街交界处,由A楼(16 为2012-02-012012-03-15,工期44d 施工期间正 层)和B楼(10层)两栋组成.本次工程加固施工 值冬季低温期(日平均气温为6~8℃,期间最高温 涉及的是B楼A区(主楼).其主体结构为10层框 度约11℃),如何确保在工期紧、气温低的条件下加 架结构,筏板基础,最大建筑高度为46.45m 平面呈 固工程用胶(底胶、浸渍胶、结构灌注胶、粘钢胶、植 矩形,东西①~2轴长71.800m 南北E~®轴宽 筋胶等)的固化时间及强度是本工程施工中应重点 20.400m 底层、2层层高为5.00m 其他层层高 予以关注的地方. 为4.00m. 2)承载力提高幅度较大,部分区域甚至达到 现因业主变更主体结构使用功能,部分区域楼 15kN/m2 荷载提高幅度为原设计值的3倍. 板荷载发生变动(楼板承载力由原来的4.0~ 3)多工种同时施工.由于工期较紧,本工程加 5.0kN/m2增至7.0~15.0kN/m2)....

资源链接请先登录(扫码可直接登录、免注册)
十年老网站,真实资源!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)