施工技术 2015年9月下 90 CONSTRUCTION TECHNOLOGY 第44卷第18期 D01:10.7672/sjs2015180090 基于ITP现场质量管理新方法的创建与实践 王继华,裴正广 (中海油基建管理有限责任公司,北京100010) [摘要]为解决建筑工程现场质量管理计划粗放控制薄弱、系统性和规范性缺乏、管理者难于全面了解重点把控等 问题,基于P构建了现场质量控制管理的新方法,并在多个大型建筑工程建设中投入运用.新方法突出了过程 控制,计划与执行情况一目了然,管理精细、系统和规范,达成的效果较为明显. [关键词]项目管理:现场管理;ITP;质量管理 [中图分类号]TU71 [文献标识码]A [文章编号]1002-8498(2015)18-0090-04 Creating and Practice of Quality Management New Method Based on ITP Wang Jihua Pei Zhengguang CNOOC Construction Management Co.Ltd.Beijing 100010 China) Abstract:Quality management new method is established based on ITP to solve the problems of poor control low system bad criterion and manager lopsided control of quality management plan and the method is applied in some large buildings construction.The new method is focused on the process control it is elaborate systemic and normative and the effect is obvious. Key words:project management;site management;inspection and test plan;quality management 检查和试验计划(inspection and test plan ITP)1.2ITP管理的优势 是用以指导和控制施工过程和质量的文件.计划 核电工程质量控制计划ITP克服了上述质量管 要求按照规定的格式编制,对特定的工作范围规定理方式的不足,比较好地解决了现场难以精细管 专门的先决条件、活动顺序、质量措施、验收标准和 理、系统管理和规范管理的难题.核电工程ITP管 资源,过程中须将检查和试验结果予以记录保留, 理突出过程控制,要求施工前对工艺文件、人员资 并需签字确认.ITP管理在国际工程中普遍采用, 质和原材料等进行检查确认,施工过程中各方对控 国内很多重要工程项目和一些造船、装备制造企业 制点验证消点,施工完毕后共同检查确认,大大增 也采用这种质量管理模式,但国内建筑行业应用还 强了计划的执行力.IP既是计划文件,也是执行 不广泛. 文件,系统性强,层次清晰,反映情况全面.将核电 1ITP管理与国内工程管理模式的比较 工程ITP管理思路移植到建筑行业,根据建筑工程 1.1国内工程管理模式的弊端 的特点,结合现有质量体系和管理方法,对工程切 目前,在建筑行业乃至整个工程建设领域,各 分方法、ITP的编制与执行以及支持ITP运行的制 个参建单位的质量管理都是通过建立和运行质量 度...
基于ITP现场质量管理新方法的创建与实践.pdf