2011年5月上 施工技术 第40卷第340期 CONSTRUCTION TECHNOLOGY 89 基槽回填波纹管降水井施工技术 李海生,张肇庆,王学武,王洋,陈明昕,马起昌 (中建一局集团第五建翼有限公司,北京100024) [摇]基槽降水井采用波斑管成井施工法术,具有工便捷、道将低廉、施工周期短等特点,是取代常规初 管井施工的理想方法.嘉里扬州酒店项口地下室面较大,基悦较深,采用波纹管威井对卷悦图绕降水的方式,拉 制地下室水值对建物的影响.说项目遥过含理的施工漏水量及管数量计算,采取含理的施工工艺,有地将 地下水位降到设计标高以下,保证了地下室传构的安金性及穆定性. [关键询]降水:回植土:渡纹管:成井 [中分类暑TU753.66 [立献识码]A [支章编1002-8498(2011)09-0089-03 Construction Technology of Corrugated Pipe Dewatering Well for Foundation Trench Backfill Li Haisheng Zhang Zhaoqing Wang Xuewu Wang Yang Chen Mingxin Ma Qichang China Construction First Division Group the Fifth Co. Ltd.Beijing 100024 China) Abstract:Dewatering well for foundation trench backfill uses construction technology of corrugated pipe well which has some characteristics such as easy construction low cost and short construction period ete. Jiali Yangzhou hotel has large-area basement and deep foundation excavation.During construction dewatering method of corrugated pipe well is adopted to reduce the influence of water level on the basement of building.By rational calculation on water inflow and number of pipe well and adopting reasonable construction technology the groundwater level is effectively reduced under the design level and the safety and stability of the basement is assured. Key words:dewatering:backfill soil:corrugated pipe:well pletion 对于高层建筑来说,当地下水位较高时,由于主8.25m 平均标高7.33m. 体结构尚来施工到抗浮设计要求的层,因此在基 根据原设计要求,塔12层、裙楼4展结构完 槽回镇土时,须在回镇土内留设降水井,以保证降水 成方可停止基悦四周降水,在此之前必须将地下水 翠统的正常运行,使地下水位维持在设计水位之下, 位拉制在设计抗浮标高以下(...
推荐内容/By 图集吧
- SH/T 3533-2024 石油化工给水排水管道工程施工及验收规范.pdf
- T/CCIAT 0012-2019 装配式钢制波纹管综合管廊工程技术规程.pdf
- JY/T 0515-2019 活塞式抽水机模型.pdf
- 综合管廊暗挖专项施工方案 135页.docx
- 中建顶管基坑支护施工方案 300页.doc
- SY/T 6715-2023 钢管管接头焊接.pdf
- SY/T 5846-2020 套管补贴工艺作法.pdf
- DB63/T 2253.7-2024 交通企业(公路)安全生产标准化规范 第7部分:隧道管护.pdf
- DB63/T 2253.6-2024 交通企业(公路)安全生产标准化规范 第6部分:桥梁管护(图文).pdf
- 中建二局《设计管理优化培训汇报材料-基坑支护及桩基》课件.pdf
- 安装工程管道挖土方计算表管道挖土方计算表.xls
- 中建管道井施工工艺标准(119页).pdf