施工技术 2015年9月上 120 CONSTRUCTION TECHNOLOGY 第44卷第17期 D0I:10.7672/sgjs2015170120 海上软土地基中大型钢板桩围堰加固技术 徐辉,梁治国 (上海建峰取业技术学院,上海201900) [摘要]三门核电一期排水口工程处于海滩软土地区,采取双排钢板桩围堰施工措施.施工过程中围堰产生了较 大变形,影响围护体系和坑内作业的安全.在分析变形产生原因的基础上,提出了围堰加固的措施并进行了加固, 取得了较好的效果. [关键词]地基;核电工程;围堰;钢板桩;加固 [中图分类号]U673.3[文献标识码]A[文章编号]1002-8498(2015)17-0120-04 Reinforcement Technology of Large-scale Steel Sheet Pile Cofferdam in Soft Foundation on the Sea Xu Hui Liang Zhiguo Shanghai Jianfeng Vocational College Shanghai 201900 China) Abstract:The outfall engineering in the first phase project of Sanmen Nuclear Power Station locates in soft soil area in a beach double-row steel sheet pile cofferdam is used.The cofferdam produces moderate finite deformation in construction which effects enclosure system and operation safety in foundation excavation.Based on the cause analysis of deformation this paper puts forward reinforcement measures good effect is obtained. Key words:foundations;nuclear power engineering;cofferdams;steel sheet piles;reinforcement 1工程概况 2地质情况(见图2) 三门核电一期工程是我国引进第三代压水堆 场地内地质情况如下:①4流泥浅灰黄色,土 核电技术自主化依托项目,采用国家全面技术引进 质较均匀,流动状.稍具腥臭味,含少量有机质,无 的第三代核电技术AP1000堆型,一期工程机组装 摇振反应,光滑,干强度高,韧性高.②淤泥灰 机容量为2台AP1000(1250MWe)核电机组,远期 色,质地均一、细腻,底部一般含有贝壳碎片及腐殖 规划容量为三期共6台AP1000核电机组. 质,无摇振反应,光滑,干强度高,韧性高,流塑.③ 一期工程排水口结构的干作业空间设计采用 黏土灰色青灰色,该层土质不均,局部为淤泥 双层钢板桩围堰形式,围堰形成后在内侧施工水泥 质黏土,夹薄层粉砂,含有少量贝壳碎片,局部见有 土搅拌桩,形成围堰基坑的围护体系,基坑开挖深 腐殖质,无摇振反应,稍有光滑,干强度高,韧性高, 度达9m.排水口呈喇叭口状,出口段宽67m 末端 流塑~软塑.①粉质黏土混角砾灰绿色,含5%~ 宽171m 整个围堰东西向长168m 中心线周长约 20%的角砾,砾径10~50mm 无摇振反应...