施工技术 2014年4月上 118 CONSTRUCTION TECHNOLOGY 第43卷第7期 D0I:10.7672/8gjs2014070118 滑升模板施工技术在信标塔工程中的应用 谢夫海 (中国矿业大学(北京)力学与建筑工程学院,北京100083) [摘要]结合某信标塔工程实例,针对工程的结构特点,介绍了信标塔滑模施工的技术控制要点.从滑模系统的安 装、钢筋混凝土施工、塔身混凝土养护、挑檐钢筋钢结构预埋件的处理以及施工注意事项等方面对滑模施工进行了 详细介绍. [关键词]模板;滑模;信标塔;施工技术 [中图分类号]TU755.2 [文献标识码]A [文章编号]1002-8498(2014)07-0118-04 Application of Sliding Formwork Construction Technology in Beacon Tower Engineering Xie Fuhai (School of Mechanics Civil Engineering China University of Mining and Technology Beijing Beijing 100083 China) Abstract:Based on some beacon tower engineering practice according to the structure characteristics of the engineering this paper introduced technology control points of sliding formwork construction.The sliding formwork construction technology were introduced in detail from sliding formwork system installation reinforced concrete construction tower concrete curing embedded parts treatment and attentions. Key words:formworks;sliding formwork;beacon tower;construction 1工程概况 试验. 北七家沙子营全向信标/测距仪台搬迁工程中 3)本工程进行滑模施工时涉及到幕墙、脚手 的全向信标台主体结构是钢筋混凝土塔结构,塔高 架、钢结构等多工种的交叉配合,施工组织要求高、 70.000m 由塔座、塔身、塔楼组成.塔身为圆形中 协调难度大.项目部应成立相应协调机构,理顺协 心筒结构,内有电梯井及楼梯间,中心筒内径为 调程序,保证各工种的钢筋或连接件的预埋符合设 7.2m 壁厚450mm 内直行墙厚为250mm 如图1所 计及施工要求. 示.中心筒及内墙采用滑模工艺施工,滑模高度为 3滑模系统主要施工装置 4.950~58.700m. 3.1液压提升系统 2主要施工难点及对策 1)滑模开字架平面布置提升架是滑模装置 1)本工程滑模施工期间正逢雨期施工,在混凝 的主要承力构件.本工程采用的提升架为双横梁 土浇筑前要关注天气情况,合理安排施工时间;滑 的“开”字形架.横梁由[10,[12制作,立柱用槽 模每次提升高度减半,混凝土采用凝结较快的配 钢、角钢、钢板焊接制成.提升架的2根立柱保持平 合比. 行,并与横梁连接成90°.滑模开字架按塔身周圈 2)滑模施工期间正值夏季气温较高的时...
推荐内容/By 图集吧
- 装配式建筑工程成本管控课件.pdf
- 中建股份《建设工程施工合同要点及风险管控》课件.pdf
- 中建四局五公司《铝合金模板基础培训》课件.pdf
- 中建一局《工程项目技术经济分析-模板、架料技术经济分析及选型指导手册华南地区分册(第一版)》.pdf
- 中建新疆建工西北公司《EPC项目管控要点经验分享》课件.pdf
- 中建新疆建工五建《技术质量在项目管理中的支撑和协同》课件.pdf
- 中建新疆建工华南公司《东莞中堂项目模板周转方案汇报》课件.pdf
- 中建新疆建工《加强能力建设,提升总承包管理水平》课件.pdf
- 中建新疆建工《构建协同管理体系 提升基础管理水平 助推公司高质量发展》课件.pdf
- 中建一局《总承包项目管理实施策划书范本》.pdf
- 中建一局建设发展公司《EXCEL技巧在商务管理工作中的应用》课件.pdf
- 最新版建设工程竣工验收消防查验报告填写范本.pdf