施工技术 2011年12月上 78 CONSTRUCTION TECHNOLOGY 第40卷第354期 黄杨泵站取水头部施工方案研究 吕其刚,徐海艳,彭军 (中国市政工程中南设计研究总院,潮北武汉430010) [摘要]对珠海市黄杨泵站取水工程中的施工技术方案进行了分析,针对不足之处结合工艺条件提出了优化设计 方案.详细介绍了优化方案中的顶管法施工、水下开挖段管道设计和钢制取水头部设计,并结合工程实践对类似 工程的施工提出建议.工程实践表明:这些施工技术的应用不仅缩短了工期、节省了投资而且降低了施工难度. [关键词]泵站;取水头部;顶管;抗浮;注浆;监测 [中图分类号]TU753 [文献标识码]A[文章编号]1002-8498(2011)23-0078-03 Study on Construction Schemes of Water Intake Head in Huangyang Pumping Station LǜQigang Xu Haiyan Peng Jun (Central and Southern China Municipal Engineering Design Research Institute Wuhan Hubei 430010 China) Abstract:Authors analyze construction schemes of water intake project of Huangyang pumping station in Zhuhai and propose optimization scheme according to the disadvantages bined with process conditions.Pipe jacking method design of pipe under water excavation and steel water intake head are introduced in detail.Meanwhile authors give advices for the similar projects bined with this project. Engineering practice shows that application of these methods not only save cost and shorten construction period but also decrease the difficulty of construction. Key words:pumping stations;water intake head;pipe jacking;anti-floating;grouting;monitoring 取水头部是水厂的重要组成部分,作为特种水 下结构,头部建筑的基本设计特点是:①工程设计 黄杨河 因地而异,几乎各不相同;②水域环境复杂、施工条 上并公路 DN2200.长度约360m 件各异;③施工费用昂贵且施工难度较大.为此, N2200.长度约360架式取水头部 黄杨河 头部结构设计必须因地制宜,合理选型与布置,才 能做到技术可靠、经济合理、施工安全简便. 图1取水工程平面布置 1工程橱 Fig.1 Layout of water intake project 珠海市乾务水厂黄杨泵站位于珠海市斗门区,2工程及水文地质条件 设计规模为100万m3/d.泵站厂址位于上井公路 拟建场地土类型为软弱场...
推荐内容/By 图集吧
- 张弦梁-弦支穹顶杂交结构预应力张拉技术研究 黄思聪.pdf
- 中交一公局集团有限公司津石高速公路天津西段项目/立交叠合梁安全专项施工方案.pdf
- NB/T 11185-2023 水电工程水土保持监测实施方案编制规程.pdf
- 中建新疆建工《机电安装工程施工组织设计编制及管理》课件.pdf
- 水电站堰坝及隧洞施工组织设计方案.doc
- 综合管廊暗挖专项施工方案 135页.docx
- 锦屏一级水电站水工隧道施工组织设计.doc
- 中建雨污分流改造深基坑专项施工方案(论证后修改版) 270页.docx
- 中建顶管基坑支护施工方案 300页.doc
- 城市轨道交通区间隧道施工组织设计186页.doc
- 中建新疆建工《施组方案(危大工程)管理培训》课件.pdf
- 中建一局总承包公司《施工方案编制培训》课件.pdf