施工技术 2014年7月上 30 CONSTRUCTIONTECHNOLOGY 第43卷第13期 DOI:10. 7672/sgjs2014130030 反循环冲击钻在风化岩层中的应用 陈新兵 (中铁建设集团有限公司,北京100131) [摘要】以某工程基坑围护桩为例,主要介绍了反循环冲击钻在强风化岩层中的施工技术。
通过实例分析岩层地 质情况,判断地质条件对施工的影响,根据影响因素选择并确定施工工艺。
同时论述了水下混凝土浇筑控制措施, 并采用瞬态时域分析法判定桩体的完整性。
[关键词]地下工程;基坑;桩;冲击钻;施工技术 [中图分类号]TU753 [文献标识码]A [文章编号]1002-8498(2014)13-0030-04 ApplicationofReverseCirculationImpactDrillinWeatheredStrata Chen Xinbing (China Railway Construction Group Co.,Lud.,Beijing100131,China) Abstract;Based on retaining piles construction in a project, this paper mainly introduced construction technology of reverse circulation impact drill in strong weathered strata.According to the analysis on rock geologicalconditions,the effect of geological conditions on construction was judged,construction methods were determined based on influence factors.Meanwhile,underground water concrete pouring measures were expounded, the integrity of pile was judged by transient time domain analysis method. Key words:underground;foundation excavation;piles; impact drill; construction 1工程概况 最终确定基坑北侧在进人强风化岩层前采用 某交通枢纽J地块拟建场地±0.000相当于绝 人工成孔方法,在进人强风化岩层后采用反循环冲 对标高75.200m,近3~5年最高地下水位埋深> 击钻继续施工,未遇风化岩桩体仍按原设计方案采 35m,设计基坑围护桩采用人工挖孔灌注桩,设计桩 用人工成孔施工。
本文重点阐述反循环冲击钻在 长21m,桩径800mm。
由于岩层的波动性较大,地 强风化岩层中的技术应用,并通过瞬态时域分析法 质勘察报告并不能准确反映某一具体桩位特定的 检测、判定桩体完整性。
岩层信息。
在实际施工过程中发现,基坑北侧强风 2工程地质条件 化岩层顶标高比地质勘察报告给定标高高出约2~ 北京市石景山区某交通枢纽J地块工程岩层地 3m,在强风化岩层中采用人工成孔工艺将严重影响 质条件如表1所示。
总体施工工期,随即暂停人工挖孔施工。
表1岩层地质条件 后初步确定基坑北侧在进人强风化岩层前仍 Table 1The rock geological conditions 采用人工成孔,在进人强风化岩层后采用机械成 地层 厚度/ 重度/ 黏聚力/ 内摩擦角/ m (kNm-3) kPa () 孔。
通过对比反循环冲击钻机和回转钻机的特点, ①杂填土 1.2 19.0 10.0 发现在卵石层、强风化岩层施工中,反循环冲击钻 ②粉质黏土 1.0 19.4 26.8 18.9 钻进速度比回转钻快2~3倍,且反循环冲击钻钻进 ③卵石、圆砾 16.0 20.0 0 40.0 ④强风化粉砂岩 7.0 20.0 25.0 30.0 5级以下岩石时,钻进速度比回转钻快5~6倍,从 注:施工场地原为居民生活区,现已拆迁,场地地势较平坦 上述情况分析来看,反循环冲击钻机在施工复杂地 3现场地质条件分析 层即卵石层、强风化岩层在成孔速度上优势明显。
3.1施工前现场地质条件分析 依据岩土工程勘察报告,施工前对现场地质条 [作者简介]陈新兵,高级工程师,国家一级注册建造师,项目经理, E-mailchenxinbing@zjg.cn 件进行分析:灌注桩设计桩长为21m,桩径800mm, [收稿日期]2014-05-06 基坑先行开挖至桩顶标高-3.200m,研究勘察点J...