盾构近间距穿越对既有隧道的影响参数研究.pdf

土压平衡盾构,学术文献
文档页数:3
文档大小:1.08MB
文档格式:pdf
文档分类:学术文献
上传会员:
上传日期:
最后更新:

2014年7月上 施工技术 第43卷第13期 CONSTRUCTION TECHNOLOGY 111 D01:10.7672/sgj92014130111 盾构近间距穿越对既有隧道的影响参数研究 朱蕾 (同济大学地下建筑与工程系,上海200092) 【摘要]软土地区盾构近距离穿越既有隧道的工程近年来不断增加.针对新老隧道间距和穿越角度这两个影响参 数对既有隧道的变形进行研究分析,采用三维有限差分软件进行数值模拟.两种方法的结果进行对比验证后,归 纳这两个参数对既有隧道垂直位移变化的规律. [关键词]隧道工程;盾构;软土;穿越;间距;角度 [中图分类号]U455.43 [文献标识码]A[文章编号]1002-8498(2014)13-0111-03 Research on the Parameters Influence on the Existing Tunnel During Nearby Shield-driven Construction Zhu Lei Department of Geotechnical Engineering Tongji University Shanghai 200092 China) Abstract:Recently more and more tunnels need to cross above or beneath the existing metro line in soft soil.To evaluate the influence of such construction on the existing tunnel two parameters were studied in this article based on monitoring data.They were the vertical interval between the two tunnels and the projection angel.The numerical simulation by three-dimensional finite difference software was also used to pared the results from the two design parameters.The displacement rules of the existing tunnel were concluded. Key words:tunnels;shields;soft soil;crossing;interval;angle 0引言 程实例的监测数据分析和数值模拟两种方法对间 上海轨道交通经过20年的工程建设,盾构掘进 距和角度这2个影响参数进行研究. 已完成了40余处穿越已运营隧道的施工.随着新 1实测数据对比分析 一轮建设,预计还会发生多处同类工程.依据新建 实测数据基于穿越工程实例中既有隧道纵向结 隧道与既有隧道的相对位置来分类,穿越类型有下 构的垂直位移(隆起或沉降)监测结果,将2个参数进 穿、上穿、重叠、并行、上下穿等,其中以下穿工程为 行分组对比(同组数据中另一分析参数基本一致), 主,施工机械以采用中6340土压平衡盾构为主.施 忽略土压力、注浆等施工参数对既有隧道的变形影 工盾构与既有隧道垂直净间距多数<0.5D(D为隧 响.测量数据取刀盘第一次切人到隧道投影线(穿越 道直径,主要为6200mm) 新建和既有隧道基本位 前)、盾尾脱出隧道投影线(穿越后)两个时间点为 于第④层和第...

资源链接请先登录(扫码可直接登录、免注册)
十二年老网站,真实资源!
高速直链,非网盘分享!浏览器直接下载、拒绝套路!
本站已在工信部及公安备案,真实可信!
手机扫码一键登录、无需填写资料及验证,支持QQ/微信/微博(建议QQ,支持手机快捷登录)
①升级会员方法:一键登录后->用户中心(右上角)->升级会员菜单
②注册登录、单独下载/升级会员、下载失败处理等任何问题,请加客服微信
不会操作?点此查看“会员注册登录方法”

投稿会员:匿名用户
我的头像

您必须才能评论!

手机扫码、免注册、直接登录

 注意:QQ登录支持手机端浏览器一键登录及扫码登录
微信仅支持手机扫码一键登录

账号密码登录(仅适用于原老用户)