施工技术 2016年8月上 22 CONSTRUCTION TECHNOLOGY 第45卷第15期 D0I:10.7672/8js2016150022 创极速光轮摩托游艺轨道及设备安装技术 张文,刘洪亮,沈勤,潘润军,路兴隆 (上海宝冶集团有限公司,上海200941) [摘要]结合上海某大型主题乐园创极速光轮摩托游艺项目轨道安装施工,样细介诏了游艺轨道设备螺栓安蒙及 立柱和旋转轨送安装技术.经实践测试,果良好,达到了先进水平. [关键词]容装工程;游乐设;爆栓;拉柱;吊装;施工拉术 [中图分类号]TU74[交献标识码]A[交章编号]1002-8498(2016)15-0022-05 TRON Lightcycle Power Run Motorcycle Track Project and Device Installation Technology Zhang Wen Liu Hongliang Shen Qin Pan Runjun Lu Xinglong (Shanghai Baoye Group Co. Lid.Shanghai 200941 China) Abstract:TRON lighteyele power run motoreycle track project and its device installation technology is introduced for a large theme park in Shanghai.The technology of rail equipment installation and bolts column and rotating track installation are indicated in detail.The practice shows that good results are reached. Key words:installation;recreational facility;bolts;columns;hoists;construction 1工程概况 有螺栓和钥匙的搭接接头(导轨处)相互连接.就 创极速光轮摩托游乐项目设各道总长996m 道与立柱是通过轨道上的短柱(也称为鞍座)法兰 整个航道按照功能划分为:上客区、发车区、室外航与立柱法兰以累栓连接,连接时将航道固定到支撑 道区、室内轨道区、下客区、设条及维修区.游艺航结构上,轨道在空中的水平位盟通过立柱上轨道位 道室内部分在302创极速光轮摩托项目建筑单体盟高度确定. 内,室外道区在创极速光轮天莱下方(见图1). 1.1航道设置 设备轨道上可以运行多列光轮摩托,最多可容 纳7列.主就道包括站、启动和重力部分.车站 采用一种平行就道,单独上下配置.游客进入车站 后从上客区上车,设备运行1圈后从下客区下季. 在上客位,用控制门系统来控制游客进入光轮摩 托,下手后游客从轨道两侧通道搬离(见图2). 图1创极速光轮摩花游乐项目故果 Fig.1 Appearance effect of TRON Lightcycle Power Run entertainment project 游艺设备轨道包舍就道支柱、立柱、支撑构件、 导航及导焊件.游乐设备支柱与地基连接 均为预埋锚圈螺栓.新道支柱和导航焊件属于航 道部分,安装立柱和结构构件时进行支撑.相邻就 图2新道功能划分 道段是用螺栓固定的法兰连接件(支柱处)以及带 Fig.2 Orbit function division 剑极速光轮摩托重力轨道由2...